Laserfiche WebLink
McCLEAN IRON WORKS <br /> WELD INSPECTION REPORT <br /> Date: 5/2/2017 <br /> Project ti/Name: 5547-Dock Inspector: Kevin Buck <br /> AWS-CWI B00111321 <br /> ❑FIELD ❑., SHOP WELDING ❑M.T. ❑P.T. ll V.T. <br /> FILLER <br /> ❑' Position: FLAT VERTICAL HORIZONTAL OVERHEAD METAL: ESAB DS70 Ultra Plus .045"Diameter <br /> ❑✓ Process: SMAW FCAW-G GMAW SAW <br /> Q Weld Type: FILLET C.P. P.P. PLUG OTHER: <br /> ❑✓ Weld Size: 3/16" 1/4" 5/16" 3/8" OTHER: <br /> 2 Codes: AWS AISC RCSC ASTM UBC ASME <br /> Work performed in accordance with AWS-D1.1, IBC 1705.2,job specifications&requirements. <br /> 1)Welding inspection of fillet and Partial Penetration welded connections were acceptable on <br /> framing assembly 85031. Framing is for a movable section of the boat launch. <br /> ® ... <br /> CWi 00111M <br /> QC1 EXP. 11/1/2018 <br /> 2102 Ross Avenue, Everett,WA 98201 Ph: 425.493.5525 Fax: 425.493.5520 Email: mcciron@mcciron.com <br />