Laserfiche WebLink
3/7/2016 Page 4--- <br /> City of Everett <br /> 2:42:15PM ,. <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1110-012 Site Address 2902 RUCKER AVE <br /> Applied 10/7/2011 Applicant Lot <br /> Approved 10/25/2011 Owner WACKERRICHARD Block <br /> Issued 10/28/2011 Contractor TENANT W/LETTER Tract <br /> Parent Permit No. Description T.I. &CHANGE USE-PEAK HEALTH&FITNESS <br /> Notes <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 12/1/2011 12/1/2011 Framing DWF PartialApproval Lounge,See notes Inspected underfloor framing Insulation <br /> R-30 to be installed-Lounge. <br /> Approved as per plans.OK to cover. <br /> 12/12/2011 12/12/2011 Underfloor DWF PartialApproval Work out area- <br /> approved per plans <br /> 12/13/2011 12/13/2011 InsulBldg MWH Approval Underfloor-R-30 <br /> 1/3/2012 1/3/2012 Framing DWF PartialApproval As per notes Need to airseaYfire stop as discussed with <br /> owner/contractor <br /> Note: Need to verify framing-non balloon <br /> type <br /> 1/25/2012 1/25/2012 InsulBldg DWF Approval As per notes Inspected insulation-R-21,and PVA in <br /> paint for vapor barrier--approved to <br /> cover-drywall <br /> Note: Contractor will"air seal"base plates <br /> and corners as discussed <br /> 1/26/2012 1/26/2012 DrywallNailing DWF Approval As per notes Inspected drywall nailing type x 5/8" <br /> installed-both areas <br /> Ok to mud/tape <br /> 3/14/2012 3/14/2012 Final Bldg DWF PartialApproval Group fitness room, Building final only for this area. <br /> see notes TCO Fire Dpt. OK for public to occupy. <br /> 7/20/2012 7/20/2012 StatusReview Approval FINAL FIRE OK <br /> PER DW <br /> 8/16/2012 8/16/2012 Framing DWF Consult-see notes Consult on new stairs/ramp-ADA <br /> 9/6/2012 9/6/2012 Framing DWF PartialApproval See notes Inspected stairway only rise(6 3/8)run <br /> (11")-approved to cover <br /> 5/13/2013 StatusReview BSM Please send letter <br /> 9/20/2013 Letter MEM Expiring,respond by <br /> 10-21-13 <br /> 10/11/2013 10/11/2013 Final Bldg DWF Corr Reqd See notes Install hand railing at ramp and steps as per <br /> IBC <br /> -. / \ <br /> I G <br /> INSP12 (9 CR!"' <br />