My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6920 SEAWAY BLVD 2019-07-08
>
Address Records
>
SEAWAY BLVD
>
6920
>
6920 SEAWAY BLVD 2019-07-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2019 8:16:24 AM
Creation date
2/26/2018 9:28:20 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
6920
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iVo <br /> w <br /> ETT <br /> 4;i <br /> (425) 257-8810 <br /> Plan Check No.: E1707-165 <br /> Application Date: 7/25/2017 <br /> ,. -._., Tenant: FLUKE <br /> �- <br /> `.3 Su 7 .�,-II")V-3Owner: FLUKE ELECTRONICS CORP <br /> `•-1 z,+ ®-n Job Address: 6920 SEAWAY BLVD POD 2B <br /> .,e, 4—•1 41.r:,41 4 1• <br /> r4l Proposed Use: MFG <br /> C - Description of Work: FIRE ALARM FOR PHASE 1 INT <br /> C.--w :3- RENOVATION <br /> c-- <br /> �: Plan Check Fee Paid: $194.35 <br /> • r_.., c_1 <br /> rJ LLI W CC <br /> Lu:I h— <br /> :a -.V • ,___1 <br /> El — De blinding permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application, it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing. If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> ( ii i <br /> i\ <br /> c 1/1-,),- 1 1/''' \ <br /> 4 , 7 <br /> Signature Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.