Laserfiche WebLink
INSPECTION REPORT <br /> Date9 I)1A X\ <br /> 1, Permit: EQ'1 - 1 Oliar <br /> �j <br /> Contractor: <br /> Owner: -‘V <br /> Site Address: ..Q Ltd O -4 vij\qdl <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> •Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Pd Electrical Final ❑Shear Nailing GAS PIPE <br /> , SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑BuildingngFinal ❑Gas Pipe Final ['NWT Final <br /> OTHER OR CONSULTATION: .kl —t-e2D—0 VA a <br /> p-A.PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION 0 r, <br /> ❑ UNABLE TO PERFORM INSPECTION: _ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> 0V l/. i ) 71 <br /> .I <br /> $ ... <br /> - 79—A—C:-1)--- 18--- <br /> AS <br /> Inspector: Hill Date: _9(11V <br /> EIR(10/06) we,- DATABAR,INC. <br />