Laserfiche WebLink
6/19/2017 Michael Leachman P.E. Page <br /> 5/12 <br /> Design Build Services, Inc. <br /> Engineering and Construction Management <br /> 28119-120th St.S.E., Monroe,WA 98272 <br /> Phone/Fax(360)793-9659 <br /> Gibbs Remodel <br /> A.) Lateral Demand,Shear Wall Detailing <br /> 5.)Gross Loading <br /> 5.1)Seismic Load 2180 Ib <br /> 5.2)Wind <br /> 8.2.1) Front 2740 Ib 10/5 psf MIN <br /> C.) Shear Wall Loads,WIND <br /> C.1) Front X-X <br /> Distribution Factors Distribution <br /> Dia ph. Between A [sf] Pressure Load [Ib] Xin X(i+1)n Xin X(i+1)n <br /> X1u -X2u 32 10 320.0 0.80 0.20 256 64 <br /> 44 5 220.0 0.80 0.20 176 44 <br /> 37 10 370.0 0.25 0.75 93 278 <br /> 42 5 210.0 0.25 0.75 53 158 • <br /> Total 577 543 <br /> X1m-X2m 74 10 740.0 0.80 0.20 592 148 <br /> 88 5 440.0 0.25 0.75 110 330 <br /> Total 702 478 <br /> Totals Y, [Ib] <br /> X1 u 577.0 <br /> X2u 543.0 <br /> X1m 1279.0 <br /> X2m 1021.0 <br />