Laserfiche WebLink
PUBLICRKS PERMIT Date: 05/19/2009 <br /> City of Everett Public Works Department Publk )rks Permit#: PW0905-018 <br /> ti,At 3200 Cedar Street Building Permit #; B0905-027 <br /> Everett, WA 98201 Planning Reference #: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 1,179.88 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> CITY OF EVERETT <br /> 3200 CEDAR ST <br /> EVERETT WA 98201 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# 00439074401300 SITE ADDRESS: 3313 SMITH AVE <br /> DESCRIPTION OF PROPOSED WORK: <br /> BUS BAYS & BRT SHELTERS AT EVERETT STATION <br /> 4 BUS BAYS/2 BRT SHELTERS <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Civil work to be done per approved plan dated 6-3-09. <br /> 5. Keep City street clean at all times. <br /> Emo <br /> YOUR INSPECTOR IS RANDY ALLEN 425-339-7403 <br /> 0 <br /> z <br /> JUL 232009 C <br /> CITY OF EVERETT <br /> Permit Services <br /> V <br /> TO P <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> ��jj because of installation and maintenance of the improvement <br /> 6 - -�a or other right-of-way use hereto applied for and further agrees <br /> to remove,same upon notice from the City and to replace <br /> Appr ed for Construction Date public i.erty dama.,-d ther-by. <br /> FINAL INSPECTION Date � 7-0.3-69 <br /> Approved as Constructed signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> L <br />