My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5309 S 2ND AVE 2018-02-26
>
Address Records
>
S 2ND AVE
>
5309
>
5309 S 2ND AVE 2018-02-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 1:43:08 PM
Creation date
2/26/2018 1:43:06 PM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5309
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II/3 i7 <br /> ,4111P - <br /> PUBLIORKS PERMIT Date: y-9/22 1 <br /> f City of Everett Public Works Department Public Works Permit#: PW1701-007 <br /> jJETT3200 Cedar Street Parent Permit#: <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee$: $ 85.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> SPRINT COMMUNICATIONS NORTH SKY COMMUNICATIONS <br /> 2210 S 35TH ST 22517 88TH AVE S <br /> TACOMA WA 98409 KENT WA 98031 <br /> PHONE: 3604024259 PHONE: 4257548134 <br /> TAX PARCEL ID# 00500302200900 SITE ADDRESS: 5309 S 2ND AVE <br /> REPLACE EX SPRINT HH WITH TWO HH <br /> Remove one existing 3'x5' Sprint HH and replace with two 3'x5' HH and trench approximately 15' to the east out of the <br /> R.O.W. onto the Sprint property at 5309 S 2nd Ave. <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Traffic Control must be done in accordance with MUTCD Standards and the Traffic ,_.... F_.y =�- ° ,: ' <br /> Control Plan approved by City of Everett dated 1/10/2017. t_., r°x� <br /> 5. Any damage to City improvements (sidewalk, curb, roadway, etc.)shall be replaced s;: w <br /> per City Standards and/or as directed by the City PW Inspector. =' ; n' : ;.-- <br /> cr.) _ <br /> 6. Street restoration must be done per COE Standard Drawing#316 and trench �, M� <br /> hT9 '.^ <br /> restoration per#610, or as directed by the City PW Inspector. Permanent restoration rr . 7 4::: cr <br /> must be completed within 2 weeks. pi-i. :;= <br /> 7. Full lane width grind and overlay is required for trenches greater than 100' in length, O <br /> multiple cuts within a 100' length section, and/or as directed by the City PW Inspector. P <br /> 8. A minimum of 5ft separation between City of Everett utilities and directional <br /> Cil <br /> boring/pavement cuts shall be maintained. .r=t d .1tt =t . <br /> Cr•.•a NJ ;.::. <br /> 9. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior ._:,-1 .0 u-, a4' ' <br /> to starting construction, to evaluate traffic control set-up, and with other inspection t" °a,=}°` :rte _›'' 0 <br /> ,:4,-pr..:, <br /> requests. '',11::: E—+ <br /> 10. Coordinate with adjoining businesses/homeowners to minimize obstruction of ,...-cr' <br /> commerce/access. O <br /> Public Works Permit Fee Breakdown: PI <br /> Cut/Bore Alley/Pavement (Parallel) $45.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages, costs,expenses,or <br /> c_,61)-7/#1.6(.1 / > i fiiizetF- causes of action that may arise because of installation and maintenance of the <br /> Approved for Construction Date improvement or other right-of-way use hereto applied for and further agrees to <br /> pp remove same upon notice from the City and to replace public property <br /> damaged t•-reb . <br /> FINAL INSPECTION Date / ,- <br /> g <br /> Approved as Constructed Signature of Applicant Da e <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> F <br />
The URL can be used to link to this page
Your browser does not support the video tag.