Laserfiche WebLink
lip INSPECTION REPORT <br /> 4/9/17 <br /> � �/ D3_D2L � <br /> _ Date 4 /7 Perini . El 70,3`C1� ']_ <br /> Contractor: 10/S- J> ,,`11/Ifit <br /> 13 (tel( S , <br /> Owner: <br /> / /G� r//�, <br /> Site Address:- _ 11_L/� _ ! / l I e s_ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> RleA-rig Grid ❑Drywall Nailing ElPlumbing Final <br /> ctrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final <br /> ❑HWT Final <br /> OTHER OR CONSULTATION: NJSI -S---3-Jta /O <br /> te <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P RMI <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED U <br /> OK FOR C.O. ❑ VIOLATION <br /> UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required 3 <br /> ----- -- I r - ` = 7_, <br /> Inspector: /1............2 <br /> Date: / 'EIR(10/06) DATABAR,INC. <br />