Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 1 1 <br /> PROJECT TITLE: <br /> Call for Bids for the Briefing COUNCIL BILL# <br /> construction of Water Main Proposed Action Originating Department Public Works/Utilities <br /> Replacement"S"Project Consent Contact Person Richard Hefti <br /> Action Phone Number 425-257-7215 <br /> First Reading FOR AGENDA OF February 7,2018 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> Administration <br /> Council President pr—< <br /> Location Preceding Action Attachments Department(s)Approval <br /> 35th Street from Federal Location Map, Public Works <br /> Avenue to Lombard Engineer Estimate <br /> Avenue and Rainier Ave <br /> from 23r1 Street to 19th <br /> Street <br /> Amount Budgeted $2,100,000 Fund 336 <br /> Expenditure Required $2,000 Account Number(s): UP 3664 <br /> Budget Remaining $2,098,000 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Water Main Replacement"S" (UP3664)will replace approximately 3,200 feet of aging 12-inch cast iron <br /> pipe in 35th Street between Federal Avenue and Lombard Avenue, with new 12-inch diameter earthquake- <br /> resistant ductile iron pipe, and replace approximately 3,800 feet of aging 3-inch and 6-inch diameter cast <br /> iron pipe water main in Rainier Avenue,between 19th Street and 23rd Street,with 1,900 feet of new 8-inch <br /> diameter ductile iron pipe. The 3-inch main is located on the west side and the 6-inch main is located along <br /> the east side of Rainier Avenue. Those mains will be abandoned in-place. The approximately 7,000 feet <br /> of pipe being replaced has experienced 12 breaks since 1990,with four of those breaks occurring within <br /> the last five years. <br /> The project is ready to advertise for construction bids. There are no supplemental bidder requirements <br /> associated with this project. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Call for Bids for the construction of theater Main Replacement"S"Project. <br />