Laserfiche WebLink
a <br /> 1. <br /> . 3 <br /> 1 <br /> . '(2)A regional,state or federal EPF shall be permitted in any zone upon the approval of a development agreement under 1 <br /> chapter 30.75 SCC.In the event of a conflict between this chapter and chapter 30.22 SCC,the provisions of this chapter shall <br /> govern. ; <br /> (3)A local EPF must satisfy the requirements of this chapter and chapter 30.42C SCC. <br /> (4)A regional,state or federal EPF must satisfy the requirements of this chapter and chapter 30.75 SCC, i <br /> (Added by Ord. 13-067,Sep.25,2013,Eff date Oct. 11,2013) i <br /> 30.42D.050 Local essential public facilities—Conditional use permit procedure. ! 3 <br /> (1)The approval process for a local EPF is a standard conditional use permit and is a Type 2 process as described in chapter <br /> 30.72 SCC. <br /> (2)A standard conditional use permit fee as listed in Table 30.86.210 SCC is required. 1 <br /> (3)Application shall be made according to the submittal requirements checklist provided by the department pursuant to SCC <br /> 30.70.030 and must include the submittal items required in,SCC 30.42D.030(3). I <br /> (Added by Ord. 13067,Sep.25,2013,Eff date Oct. 11,2013) <br /> 1 <br /> 30.42D.060 Decision criteria for local essential public facilities. <br /> (1)The hearing examiner may impose reasonable conditions(including mitigation measures)on a proposal for a local EPF. <br /> As a condition of approval the hearing examiner may: <br /> (a)Increase requirements in the standards,criteria,or policies established by this title; <br /> (b)Stipulate the exact location of a local EPF as a means of minimizing hazards to life or limb,property damage, 1 <br /> 2 <br /> impacts to the environment,erosion,underground collapse,landslides,and transportation systems; g <br /> (c)Impose reasonable conditions necessary to avoid,minimize or mitigate any adverse impacts identified as a result of 1 <br /> i <br /> the project;and F <br /> (d)Require the posting of construction and maintenance bonds or other security as provided in chapter 30.84 SCC, <br /> sufficient to secure to the county the estimated cost of construction,installation and maintenance of required 1 <br /> improvements.• ?. <br /> (2)The hearing examiner may approve or approve with conditions,a conditional use permit for a local EPF when the i <br /> proposal complies with the applicable requirements of chapters 30.42C and this chapter.The hearing examiner also may <br /> consider whether the proposal is consistent with the following factors: <br /> (a)The proposal is consistent with the objectives and policies under Goal 12 in the Capital Facilities chapter of the 1 1 <br /> General Policy Plan; 1 <br /> (b)The project applicant has demonstrated a need for the project,as supported by an analysis of the projected service i <br /> population,an inventory of existing and planned comparable facilities,and the projected demand for the type of facility D <br /> i <br /> proposed; <br /> (c)If applicable,the project would serve a significant share of the county's population,and the proposed site will <br /> reasonably serve the project's overall service population; € <br /> (d)The applicant has reasonably investigated alternative sites,as evidenced by a detailed explanation of site selection I <br /> methodology, <br /> (e)The project is consistent with the applicant's own long-range plans for facilities and operations; <br /> I <br /> (f)The project will not result in a disproportionate burden on a particular geographic area; <br /> (g)The applicant has provided an opportunity for public participation in the siting decision and development of <br /> mitigation measures that is appropriate in light of the project's scope,applicable requirements of the county code,and 2 <br /> state or federal law; t <br /> (h)The project site meets the facility's minimum physical site requirements,including projected expansion needs.Site f <br /> requirements shall be determined by the minimum size of the facility,setbacks,access,support facilities,topography, <br /> geology,and on-site mitigation; i <br /> (i)The proposal,as conditioned,adequately mitigates adverse impacts to life,limb,property,the environment,public 1 <br /> health and safety,transportation systems,economic development and other identified impacts; <br /> (T)The proposal incorporates specific features to ensure it responds appropriately to the existing or intended character, i <br /> appearance,quality of development,and physical characteristics of the site and surrounding property;and <br /> (k)The applicant has proposed mitigation measures that provide assistance to displaced or impacted businesses <br /> including assistance in relocating within the county. i <br /> 3 <br /> 3 <br /> i <br /> Exhibit 2 -page 23 <br />