Laserfiche WebLink
The Subarea Plan EIS does not analyze every conceivable site-specific detail and impact for all <br /> potential uses. Some projects with impacts outside of the range evaluated will need to be addressed as <br /> projects come before the City. However, environmental review of these projects will be limited to <br /> issues not previously addressed in this environmental review and should be relatively well known to the <br /> public and applicants. The net effect is to reduce or eliminate the potentially time-consuming and <br /> duplicative SEPA process by including environmental analysis in the body of the plan. <br /> A major purpose of this project is the integration of SEPA and GMA in the subarea plan, zoning code, <br /> and development regulations of the City of Everett. <br /> A new development review and permit system will be designed to administer the subarea plan, SEPA <br /> integration and applicable City codes. The new system will be capable of monitoring development and <br /> providing data and a feedback mechanism to inform future planning and capital facilities capacity <br /> management, planning and financing. The City will continue to complete site plan reviews for <br /> developments to ensure consistency with the Subarea Plan and compliance with ordinances and <br /> mitigation measures. <br /> Snohomish County must decide how or if its permit process will be revised to expedite review of <br /> development proposals on Paine Field properties. <br /> The Subarea Plan process involves citizens early in the planning and the environmental review process and <br /> provides for ongoing citizen participation in planning and development procedures, including future <br /> updates of the Subarea Plan. <br /> SECTION 2z DESCRIPTION OF SW EVERETT/PAINE FIELD SUBAREA <br /> The Southwest Everett/Paine Field area is one of the largest areas of undeveloped, industrially zoned land <br /> with public service capacity in Washington State. There are approximately 3,935 acres in the Subarea <br /> which is shown on Figure 1. Approximately 1,000 acres are undeveloped or have expansion capacity in <br /> addition 14 the expansion capacity included in the master plans for Paine Field, Boeing, and Fluke <br /> Corporation. The area is home to significant industrial businesses including Boeing Everett, Intermec, <br /> Fluke Manufacturing, Tramco, Associated Sand and Gravel, and others. The location is well suited for <br /> additional high tech and manufacturing activities and has a fully operational training center associated with <br /> Everett and Edmonds Community Colleges. Basic infrastructure and services including water, sewer, <br /> transportation (road, rail and air), electricity, natural gas, and fiber optics are in place to serve most of the <br /> area. Paine Field serves significant government, business, and general aviation and transportation needs <br /> including those of Boeing. As a result of the Boeing expansion in 1991, over $220 million in <br /> transportation improvements have been built or are under construction, including $47 million contributed <br /> by Boeing. <br /> The Southwest Everett/Paine Field area has the potential to provide high tech, manufacturing, and high- <br /> wage jobs for the region. This area is designated in Everett's GMA Comprehensive Plan as <br /> industrial/manufacturing, placing emphasis on this area as a resource of regional, statewide, and even <br /> national significance. Boeing's production of 747, 767 and 777 aircraft at their Everett plant represents a <br /> substantial percentage of the nation's positive trade balance. Similarly, Fluke Manufacturing and Intermec <br /> 3 <br />