My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3595-18
>
Ordinances
>
Ordinance 3595-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 10:21:39 AM
Creation date
3/7/2018 10:21:37 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3595-18
Date
2/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/1"//.-A-1 <br /> ORDINANCE NO. <br /> 3595-18 EI/F/FETT <br /> AN ORDNANCE creating a special improvement project entitled, <br /> "Broadway 10th St. to 19th St. Intersection Safety,"Fund 303, <br /> Program 104, to accumulate all costs for the improvement, and <br /> repealing Ordinance No. 3446-15. <br /> WHEREAS, the City of Everett is committed to a planned pedestrian safety program; and <br /> WHEREAS, the City of Everett has identified the need and obtained funds to construct certain <br /> pedestrian improvements to federal arterial street segments; and <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special improvement project is hereby established as Fund 303, Program 104, entitled <br /> "Broadway 10th St. to 19th St. Intersection Safety,"to accumulate all costs for the <br /> improvement, and repealing Ordinance No. 3446-15. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments from Fund 303, <br /> Program 104, for the improvement project. <br /> Section 3: <br /> Authorization is hereby granted for the "Public Works Director" or"City Engineer,"under <br /> direction of the Mayor,to assume full and complete responsibility for conducting all tasks and <br /> doing all things to accomplish the actions authorized in this ordinance. <br /> Section 4: <br /> The sum of$767,800 is hereby appropriated to Fund 303, Program 104, "Broadway 10th St. to <br /> 19th St. Intersection Safety," as follows: <br /> A. Estimated Project Costs <br /> Design and Construction $ 767,800 <br /> Total Estimated Cost $ 767,800 <br />
The URL can be used to link to this page
Your browser does not support the video tag.