My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2301 COLBY AVE 2018-03-12
>
Address Records
>
COLBY AVE
>
2301
>
2301 COLBY AVE 2018-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2018 2:22:08 PM
Creation date
3/12/2018 2:21:56 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2301
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kirk Brooks <br /> From: Jim Venturo <br /> Sent: Thursday, February 23, 2017 7:52 AM <br /> To: Meg Haley; Kirk Brooks; Dion Smith <br /> Cc: Paul McKee <br /> Subject: RE: Stoyan Apartments/2301 Colby Ave/ Everett <br /> Attachments: Archived attachment list.txt <br /> Quick Look <br /> Good work <br /> From: Meg Haley <br /> Sent: Wednesday, February 22, 2017 4:01 PM <br /> To: Kirk Brooks; Dion Smith <br /> Cc: Paul McKee; Jim Venturo <br /> Subject: RE: Stoyan Apartments/ 2301 Colby Ave/ Everett <br /> Thanks all, especially to Kirk and Dion, for getting this resolved. <br /> Meg <br /> From: Kirk Brooks <br /> Sent: Wednesday, February 22, 2017 2:05 PM <br /> To: Dion Smith <br /> Cc: Meg Haley <br /> Subject: FW: Stoyan Apartments/ 2301 Colby Ave/ Everett <br /> Dion, <br /> Thank you for speaking to me this morning regarding the proposed system at 2301 Colby Ave. I have an additional <br /> comment that I would appreciate you include in your submittal. Please indicate on your calculation Summary and also <br /> on your plan that this system is a NFPA 13R. I look forward to seeing the revised plan. Kirk <br /> From: Kirk Brooks <br /> Sent: Wednesday, December 07, 2016 3:14 PM <br /> To: 'Dion Smith' <br /> Subject: FW: Stoyan Apartments/ 2301 Colby Ave/ Everett <br /> Dion, <br /> I have been tasked with some of the review for permitting on this project.We met with Stoyan yesterday to sort out <br /> what is needed for the water service.We originally had planned to install a 2" meter that was apparently to be used as <br /> both the fire and domestic service. However,City standards require that any residential use with more than a duplex <br /> must have a separate domestic meter. <br /> This project will likely use the existing service as the domestic or we will install a new one. Based on our discussions with <br /> Stoyan and the water Department, We will be making a 2"tap on the main and then a DCDA will be installed in the <br /> building.They have a room that could possibly be sized to accommodate the 2"assemble. <br /> 1 ': <br />
The URL can be used to link to this page
Your browser does not support the video tag.