<br /> February 17, 201.5
<br /> Mr Doug Engelson, l A
<br /> ImpressionDesian
<br /> 2418 Colby Ae
<br /> Everett, WA P8201
<br /> i � -, q.- l ) r ;iv\i i r
<br /> Owner Mr Stoyan Mitrachkov ,, Er„V;;-[ ___ r! �.+ ,
<br /> Project: Restore Two Residential Unit and Offices ii l-i , l f,l
<br /> Job Address:. 2301 Colby Ave a
<br /> ,. rE.B 2 7 LU J kS
<br /> Plan C:leck No: `C31N1501-00?_ ir ° x f✓,
<br /> RE: Second Corrections Letter l d 'i` :.XF_:‘''':::., '''':::.-''...- ,I i
<br /> Dear Mr.:Engeison,
<br /> In response toyour application.for a construction permit,your plans have been examined and you
<br /> are advised that revisions may be necessary before a permit can be issued. Please review and
<br /> i espond to the;.comments below. In order for the processing of your application to continue, it
<br /> will lxem necessary to providf.the RRtiiildinq Division with two complete insert.: pages of construction
<br /> documents reflecting the c:orrections requested which can be sent by e-rrtail Please include a
<br /> l esporase letter. that indicates how the corrections were resolved, and cloud and`date revisions
<br /> to the-ur�vvings fir clarity.
<br /> GepEral
<br /> 1. Pievious cominerit: Tile applicable cod9s at the end of this letter should be included in
<br /> the Code analysis, reAl'ic:e v164.z. of b s.k.-4-_,1
<br /> , m
<br /> 4- /2. Previous comment: Please include a mechanical permit application if the building permit
<br /> u u pe4K, drawn gs are`being submitted for mechanical permit review. Y ok„
<br /> 'Ilitr 4iiele. r r3. Previous comment All work done without permits or witho :t approval should be shown
<br /> as new work on the drawings.
<br /> aF The second:-floor deck is new and should be shown as new on the drawings.-
<br /> ,....,;-14,0-,94$4611/411,
<br /> alj : Unit D toilet plumbing fixtures have been relocated and should be shown as new.
<br /> �.Z- -› Unit sC has a new toilet room which should,be shown as new, to include new
<br /> fixtures and a new'whole house fan.
<br /> i _ARS — d. See`Construction'comment 3 for bedroom revisions that should be shown on
<br /> l fiz-i 1.1a..\,/ STA -S ✓ .the plans.
<br /> Structural
<br /> '6”' 1 1 The quadruple joists shown on the framing plan should be shown on the cross-section,
<br /> 490 6 HT z