Laserfiche WebLink
INSPECTION REPORT <br /> Date*/ Permit J' 6 70 032 <br /> or <br /> Contractor: L hi. 11 -toe-Nsit.. <br /> rflot <br /> 11 Owner: 3 t <br /> -/, 4. <br /> Site AddressX /1(g �3 Z 5/6k-1/41-k) dat/ # <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑St ctural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Serviceraming ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final �❑Gas PipeFinal ❑HWT Final <br /> OTHER OR CONSULTATION: 5�- ( ' °-2-87 7? <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED El <br /> FOR C.O. ❑ VIOLATION <br /> ENABLE TO PERFORM INSPECTION: <br /> �❑ C_A L(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> /1/G <br /> K.., L <br /> l <br /> Inspector: Date: 10 `J <br /> EIR(10/06) DAT AR,INC. <br />