My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4414 RIVERFRONT BLVD 2018-03-13
>
Address Records
>
RIVERFRONT BLVD
>
4414
>
4414 RIVERFRONT BLVD 2018-03-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2018 9:09:59 AM
Creation date
3/13/2018 9:09:52 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
4414
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ci o4yo <br /> Yi)11 .4 cL <br /> EO S Z FIELD REPO_ <br /> Project Name: Everett River Front-Simpson Report:008 <br /> GeoDesign#: Polygon-127-03 Date: 11/18/2016 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather:Clear,40's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 0745/1545 <br /> Distribution: I. m — <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) t Dave Foster(City of Everett) Prepared By: Ben Weinberg, E.I.T. <br /> Attachments m Site Plan(s) _ ® Density Test Summary _Signature: <br /> Liµinstallation Records O Other Reviewed By: 7'.z <br /> PURPOSE of VISIT:GeoDesign representative, Benjamin Weinberg,was on-site part time at the request of John Feltner <br /> with Polygon to observe the foundation subgrade for Lots 121 and 122. <br /> SUMMARY of OBSERVATIONS: <br /> Lot 121: <br /> Today, GeoDesign observed the exposed foundation subgrade for Lot 121;the foundation and crawl space excavation had <br /> been completed prior to our arrival on-site. The exposed foundation subgrade consisted of a gray silty SAND with gravel. <br /> Penetration depths encountered using a 1/2 inch diameter soil probe were generally less than 2 inches. Relative <br /> compaction of relatively undisturbed exposed foundation subgrade material was tested using a Troxler Moisture-Density <br /> gauge. In-place density tests indicated that the exposed foundation subgrade material had been compacted to greater than <br /> 95%of its maximum dry density as determined by a Modified Proctor analysis. <br /> GeoDesign noted scattered surficial pockets of approximately 3 inches of material which were saturated and exhibited <br /> yielding underfoot. The precise footing locations were not marked out while we were on-site. GeoDesign recommends that <br /> any surficially loose and saturated material be removed from the base of the foundation areas prior to the placement of <br /> concrete. <br /> isidielaariat <br /> Today,GeoDesign observed the exposed foundation subgrade for Lot 122;the foundation and crawl space excavation had <br /> been completed prior to our arrival on-site. Previously,GeoDesign recommended the over-excavation of the west half of the <br /> foundation area down to firm and unyielding material,which had been completed prior to our arrival on-site(1 foot). The <br /> contractor lined the base of the excavation with a standard nonwoven geotextile and intends to backfill the area with 2-inch <br /> clean crushed railroad ballast compacted into a firm and unyielding mass. The exposed foundation subgrade consisted of <br /> a gray silty SAND with gravel. Penetration depths encountered using a 1/2 inch diameter soil probe were generally less <br /> than 2 inches. Relative compaction of the exposed foundation subgrade material was tested using a Troxler <br /> Moisture-Density gauge. In-place density tests indicated that the exposed foundation subgrade material had been <br /> compacted to greater than 95%of its maximum dry density as determined by a Modified Proctor analysis. <br /> GeoDesign noted scattered surficial pockets of approximately 3 inches of material which were saturated and exhibited <br /> yielding underfoot. The precise footing locations were not marked out while we were on-site. GeoDesign recommends that <br /> any surficially loose and saturated material be removed from the base of the foundation areas prior to the placement of <br /> concrete. <br /> A summary of our observations can be found in the attached Figure 1 and Nuclear Density Gauge Data. <br /> The client and concrete contractor were notified of our observations prior to our departure from the site today. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project Irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractors employees <br /> or agents.Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By'section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.