GE E S G N FIELD REPORT <br /> 1e <br /> 1 Project Name: Everett River Front Simpson Report: 009 <br /> II-GeoDesign#: Polygon-127-03 Date: 11/21/2016 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> 1 PW 1505-005 <br /> 1 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Clear,40's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) _ Arrival/Departure: 1500/1545 <br /> Distribution: _._._.... _.._............_._......._._.._._..._......_...._.... ._.._.. ........ <br /> Doug Ross(Polygon) ' Kirk Keck(City of Everett) ...V _._...-..........._....___�_._._.... __ .__...._..._._.......__�................_._-..._.-..... <br /> Paul McKee(City of Everett) . Dave Foster(City of Everett) Prepared By: Ben Weinberg, E.I.T. <br /> m_ Site Plan(s) m Density Test Summary Signature: . . ;_' -''''.-e-,--;:=, <br /> Attachments: Reviewed By: <br /> 0 Installation Records 0 Other <br /> PURPOSE of VISIT: GeoDesign representative, Benjamin Weinberg,was on-site part time at the request of John Feltner <br /> with Polygon to observe the foundation subgrade for Lot 122. <br /> SUMMARY of OBSERVATIONS: <br /> Lot"122:_.. <br /> Previously, GeoDesign observed the over-excavated portion on the west half of Lot 122. Today, GeoDesign noted that the <br /> foundation excavation subcontractor had placed a non-woven geotextile material and backfilled the excavation with a 2 inch <br /> clean crushed railroad ballast material compacted into a firm and unyielding mass. <br /> It is the opinion of GeoDesign that the foundation subgrade observed today is currently suitable for support of the intended <br /> structure. GeoDesign recommends that any surficially loose and saturated material be removed from the base of the <br /> foundation areas prior to the placement of concrete. <br /> A summary of our observations can be found in the attached Figure 1. The client and concrete contractor were notified of <br /> our observations prior to our departure from the site today. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. - <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br /> 1 <br />