Laserfiche WebLink
FIELD REPORT DER 033 <br /> 7 <br /> GE - PHOTO LOG Date: 5/01/201 <br /> 5 <br /> �� , b <br /> y tt F r <br /> • 7 �, " 0 <br /> er <br /> C. b.0 x w �+ r.� y <br /> Comments: Lot 212 area backfilled with 2 inch railroadComments: Lot 211 area backfilled with 2 inch railroad <br /> ballast material ballast material <br /> Comments: Comments: <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the <br /> contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does <br /> not include supervision or direction of the contractor,the contractor's employees or agents. Our firm is not responsible for site safety. This field report is a - <br /> DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered final upon review of the <br /> GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />