Laserfiche WebLink
INSPECTION REPORT <br /> Date: I 5� P- it:tV V \ -0Q7__ <br /> Contractor: 1 Ali— <br /> Owner: <br /> l`Owner: <br /> Site Address: I-1 1@'MOrCji1 ?c\ �v <br /> TYPE OF INSPECTION REQUESTED <br /> BUILDING MECHANICAL PLUMBING <br /> ice ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> V•-iling Grid ❑Drywall Nailing ❑Plumbing Final <br /> sA Electrical Final ❑Shear Nailing GAS PIPE <br /> S WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMI <br /> • K FOR T.C.O. ❑ CORRECTION REQUESTED <br /> K FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> sJ <br /> Inspector: /AA Date: ' 1 <br /> ElR(4/09) !� _.Ama..€.F&RMS&PROMOTIONS•425/488-8900 <br />