Laserfiche WebLink
INSPECTION REPORT <br /> oexo <br /> , _ Date ( 7Pernit: c . <br /> 31 � _. ��O��Q <br /> Contractor: ffK.e (7�ti <br /> Owner: ____5_,,,,,,,, <br /> J <br /> Site Address: 7-1 ( )1 )t tive S6 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab roundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTH OR CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED El <br /> • OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> '.4°1\/(.° ,XII---; 2--- /6) 4.--/-7=r5 <br /> r <br /> o� /ce L ,- -c ft— 4/ <br /> 4 c ()To F-2- <br /> L <br /> Inspector: - Date: [ r/ 7 <br /> EIR(10/06) pi- DATABAR,INC. <br />