Laserfiche WebLink
y: INSPECTION REPORT <br /> Date /(/ 5/l7Permit: e/0,06,-.0 3, <br /> Contractor: GGI C <br /> Owner: e P/n%(' <br /> Site Address: -74q.2 7 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation hanical Final Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ,PtGmbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OR T.C.O. ❑ CORRECTION REQUESTED El <br /> FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> OP rn'--e.- Jt/, 1---/s3 <br /> A <br /> ii--- rI / L <br /> 11----2- , c.1%4 rik r-, <br /> 5 C'e iyk.„pr <br /> 15`,05 ;-� Tlid - A$ )( c' <br /> e)iv f- • -� ,P si <br /> h t/V <br /> �- . - of, yr X - L <br /> Inspect° . teT-""// Z 49•-•/7EIR(10/06) ((((( DATABAR,INC. <br />