My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4416 29TH AVE SE 2018-03-14
>
Address Records
>
29TH AVE SE
>
4416
>
4416 29TH AVE SE 2018-03-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 12:05:23 PM
Creation date
3/14/2018 12:05:16 PM
Metadata
Fields
Template:
Address Document
Street Name
29TH AVE SE
Street Number
4416
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4L\\ 0 a* s� 1 - 211 <br /> G EO DESIGN FIELD REPO: <br /> -4610,0 <br /> Project Name: i Everett River Front-Simpson Report: 033 <br /> GeoDesign# Poly9on-127-03 Date: 05/01/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW 1505-005 <br /> �sJ o"to�-1 02 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather:Clear, 50's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1000/1030 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) 1630/1715 <br /> Paul McKee(City of Everett) 1 Dave Foster(City of Everett) Prepared By: Ben Weinberg <br /> Attachments: m Site Plan(s) m Density Test Summary Signature: �:--(/ <br /> Installation Records Other Reviewed Bynet <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg,was on-site part time at the request of Craig with DDS to <br /> observe the foundation subgrade for Lots 211, 212,and 226. <br /> SUMMARY of OBSERVATIONS: <br /> Lot€ <br /> Today, GeoDesign noted that DDS had backfilled the previously over-excavated area on the west 2/3 of Lot 211 with a <br /> 2-inch railroad ballast material that was compacted into a firm and unyielding mass. It is the opinion of GeoDesign that the <br /> foundation subgrade is currently suitable for support of the intended structure. <br /> Lot 212: <br /> Today, GeoDesign noted that DDS had backfilled the previously over-excavated area on Lot 212 with a 2-inch railroad <br /> ballast material that was compacted into a firm and unyielding mass. It is the opinion of GeoDesign that the foundation <br /> subgrade is currently suitable for support of the intended structure. <br /> Lot 226: • <br /> Today, GeoDesign noted that DDS had excavated the foundation and crawl-space area for Lot 226. During our morning <br /> site visit, GeoDesign observed an area along the west side of Lot 226 which would require 1 to 1.5 feet of over-excavation <br /> down to firm and unyielding material. DDS had over-excavated the previously identified area down to firm and unyielding <br /> material. During our afternoon site visit, GeoDesign noted and identified material along the north and east side of Lot 226 <br /> which could be probed 6-12 inches. <br /> Relative compaction of the exposed foundation subgrade material was tested using a Troxler 3430 Moisture-Density gauge, <br /> In-place density tests Indicated that the material along the west and south side of Lot 226 had been compacted to greater <br /> than 95%of its maximum dry density. Material along the north and east side of Lot 226 had been compacted to less than <br /> 95%of its maximum dry density. GeoDesign notified the client that the area(marked in orange paint)would require <br /> over-excavation down to firm and unyielding material <br /> A summary of our observations and density tests can be found in the attached Figure 1, Nuclear Density Gauge Data, and <br /> Photo Log. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents.Our firm Is not responsible for bite safety.This field report Is a DRAFT representation of our field observations,testing,and preliminary recommendations,The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by Initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.