Laserfiche WebLink
G EODESIGNY NUCLEAR DENSITY GAUGE DATA <br /> GDI Project: Polygon-1 27-01 Project Name: Everett Riverfront-Simpson Date: 9/30/2016 <br /> Sampled By: BGW Project Location: Everett,WA -age: 3 o <br /> Material Source Density:pcf(required) Optimum Moisture <br /> A Polygon-127-01_20160511_51 A 1 35.2 ASTM D1557C A 7.0 <br /> B Polygon-127-01_20160527_52 B 1 30.9 ASTM D1557C B 8.7 <br /> C Polygon-127-02_20160421_52 C 1 36.5 ASTM D1557C C 6.7 <br /> D D D <br /> *BG= below grade <br /> Test pateLocation **Blows) Elevation* Fill Type Compactor Dry Density % % % <br /> No. 12-in (pcf) Moisture Maximum Required <br /> 1 9/29 LOT 125-EAST PERIMETER-CENTER 14* 0 B _ Roller? 126.3 9.7 96.5% 95 <br /> 2 9/30 LOT 125-NORTH PERIMETER-CENTER 13* 0 B Roller 128.1 11.4 97.9% 95 <br /> 3 9/30 LOT 125 SOUTH PERIMETER-CENTER 13* 0 B Roller 126.8 11.2 96.9% 95 <br /> 4 9/30 LOT 125-WEST PERIMETER-CENTER 11* 0 B Roller 124.3 10.2 95.0% 95 <br /> 5 9/29 LOT 126-NORTH PERIMETER-CENTER 15* 0 B Roller? 125.1 9.6 95.6% 95 <br /> 6 9/30 LOT 126-SOUTH PERIMETER-CENTER 13* 0 B Roller 124.3 10.2 95.0% 95 <br /> 7 9/30 LOT 126-EAST PERIMETER-CENTER 11* 0 B Roller 125.3 10.2 95.7% 95 <br /> 8 9/30 LOT 126-WEST PERIMETER-CENTER 13* 0 B Roller 124.3 11.3 95.0% 95 <br /> Polygon-127-01 20160930_D ensity <br />