My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4419 29TH AVE SE 2018-03-14
>
Address Records
>
29TH AVE SE
>
4419
>
4419 29TH AVE SE 2018-03-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 3:12:39 PM
Creation date
3/14/2018 3:12:34 PM
Metadata
Fields
Template:
Address Document
Street Name
29TH AVE SE
Street Number
4419
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kirk Brooks <br /> From: Michael Brick <br /> Sent: Friday,April 29,2016 12:29 PM <br /> To: Kirk Brooks <br /> Subject: Polygon Riverfront(Eclipse and Simpson Sites)Traffic Mitigation Fees <br /> Kirk, <br /> I located the Traffic Impact Analysis by Transportation Engineering NorthWest for this project dated 6/16/2014. Based <br /> on their study I have figured out the per-unit and proportionate share fees for these projects. Here is a breakdown to <br /> the traffic mitigation fees due for the Polygon Riverfront projects: <br /> . Date of Eclipse Site 62)tor0 Simpson Site a we,, <br /> Payment <br /> Per-Unit System Wide Proportionate Share Per-Unit System Wide Fee Proportionate Share <br /> Fee of Off-site of Off-site <br /> Improvements Improvements <br /> Before • ($351 per Unit $4,875 due with final $854er Unit <br /> p $14,300 due with final <br /> 6/2/2017 "per unit"fee "per unit"fee payment <br /> payment <br /> On or after (0.39 trips x fee per trip $4,875 due with final (0.95 trips x fee per trip in, $14,300 due with final <br /> 6/2/2017 in effect at payment) per "per unit"fee effect at payment) per "per unit"fee payment <br /> Unit payment Unit <br /> The proportionate share payment for signal improvements should be collected when the traffic mitigation fee for the <br /> last unit in each development are paid. These fees are not tied to inflation and will not change if they are paid after June. <br /> 2, 2017 when the per-unit fee increases. <br /> If you have any further questions please let me know, <br /> Michael Brick, P.E. <br /> Associate Traffic Engineer <br /> City of Everett Public Works <br /> (425)257-7790 <br /> • <br /> • <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.