Laserfiche WebLink
INSPECTION REPORT(n• `-F.Pv---- <br /> A <br /> # _ Date 1 1 kg Permit: Cc O l OA <br /> Contractor: <br /> Owner: 0 Cs 1 <br /> Site Address: 4(4c_ 0 2-`1.-c- `; -t c€E. V ZS <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ['Service ■F .ming ❑Rooftop Units ❑Water Service <br /> ❑Grounding Ti Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid •Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final (.❑Gas Pipe <br /> Final El HWT Final <br /> C <br /> OTH R OR CONSULTATION: `2-S 2rl ,CO uFi1 `1 <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ 0 OR T.C.O. ❑ CORRECTION REQUESTED <br /> El <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> (2 'b <br /> k"." P(9 (s"' <br /> 1/1/k <br /> ` <br /> Inspector: `' Date: i <br /> EIR(10/06) DATABAR,INC. <br />