Laserfiche WebLink
FIELD REPORT DFR 035 <br /> CEO <br /> ESIGNz aDate: 5/03/2017 <br /> PHOTO LOG r__5732011__.; <br /> 5 f s� <br /> -_ �.� < t <br /> l <br /> . <br /> ,$ ,. S'" <br /> w <br /> Comments: Lot 236-Lot area which had been backfilled Comments; Lot 236 Lot area which had been backfilled <br /> with railroad ballast material. with railroad ballast material. <br /> *� :10 <br /> r _ ` <br /> S <br /> ,a syr <br /> xa{�`.. ; w <br /> kk-4` <br /> * nc <br /> a4 w ' <br /> 1 <br /> Comments: Lot 238 South half of lot area which could Comments: Lot 238 North half of lot area <br /> be probed 1 foot <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the <br /> contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does <br /> not include supervision or direction of the contractor,the contractor's employees or agents. Our Firm is not responsible for site safety. Tbis field report is a <br /> DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered Final upon review of the <br /> GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.4900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />