My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4419 30TH DR SE 2021-12-15
>
Address Records
>
30TH DR SE
>
4419
>
4419 30TH DR SE 2021-12-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 11:38:20 AM
Creation date
3/15/2018 1:33:00 PM
Metadata
Fields
Template:
Address Document
Street Name
30TH DR SE
Street Number
4419
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGN'z ��IS �j�'h �i-S� CUILI/ FIELD R <br />Pro ect Name: <br />Everett River Front- Simpson <br />Report: 037 <br />GeoDesign # : <br />Polygon-127-03 <br />Date: 05/06/2017 <br />Deports with Unresolved Nonconformance Issues: <br />Nick Abdelnour (Polygon) Randy Allen (City of Everett) <br />Permit: <br />PW1505-005 <br />Weather: Cloudy, 60's <br />Distribution: <br />Ron Bowen (Polygon) <br />Eddy Stevens (Polygon) <br />Arrival/Departure: 1345/1315 <br />Doug Ross (Polygon) <br />Kirk Keck (City of Everett) <br />-_ <br />Paul McKee (City of Everett) <br />Dave Foster (City of Everett) <br />Prepared By. Joe Dapcevich <br />Attachments: <br />® Site Plan(s) <br />❑ Density Test Summary <br />Signature: <br />Installation Records <br />Other <br />Reviewed By:' <br />PURPOSE of VISIT: GeoDesign representative, Joe Dapcevich, was on -site part time at the request of Craig with DDS to <br />observe the backfill for Lots 224, 225, and 238. <br />SUMMARY of OBSERVATIONS: <br />Lot 224: <br />Crews Informed GeoDesign that they had over -excavated the SE corner of Lot 224 approximately T and backfiiled with <br />approximately 3' of quarry spalls. GeoDesign observed that non -woven geotextile fabric had been laid out on top of the <br />spalls and the rest of the over -excavated lot subgrade. GeoDesign observed that crews were in the process of backfiiling <br />the rest of the over -excavation with recycled concrete to bring up to planned foundation grade. <br />Lot 226: <br />observed that crews had placed non -woven geotextile fabric throughout the entire over -excavated lot subgrade. <br />-observed crews begin to backfill the lot with 2-inch railroad ballast to bring up to planned foundation grade. <br />GeoDes gnobserved that crews backfilling the over -excavated lot subgrade with 2-inch railroad ballast to bring up to <br />planned foundation grade. <br />The contractor was notified of GeoDesign's observations prior to GeoDesign's departure from the site. Craig informed <br />GeoDesign that crews plan to place all remaining backfill material in lifts and compact with a roller. Crews also plan to <br />place a thin lift of well -graded crushed rock on top of the foundations to smooth out the lots. <br />services, We rely on <br />Peivision or direction <br />10700 Meridian Avenue North, Suite 402 1 Seattle,WA 98133 1 206.838.9900 <br />2502 Jefferson Avenue I Tacoma, WA 98402 1 253.203.0095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.