Laserfiche WebLink
PSA EXHIBIT B-1 <br /> Exhibit G-1 <br /> Subconsultant Fee Determination - Summary Sheet <br /> (Mandatory when Subconsultants are utilized) <br /> Project: Everett UP No. 3684 - Water Main Replacement "T" <br /> Sub Consultant: Krazan and Associates, Inc. - Proposal No. G18046WAL <br /> Direct Salary Cost (DSC): <br /> Classification Man Hours Rate Cost <br /> Senior Geotechnical Engineer 4 x $ 43.271 = $ 173.08 <br /> Project Engineer/Geologist 24 x $ 24.230 = $ 581.52 <br /> Field Engineer/Geologist 24 x $ 24.230 = $ 581.52 <br /> Drafting 16 x $ 22.500 = $ 360.00 <br /> Total DSC = $ 1,696.12 <br /> Overhead (OH Cost -- including Salary Additives): <br /> OH Rate x DSC of 158.88% x $ 1,696.12 = $ 2,694.86 <br /> Fixed Fee (FF): <br /> FF Rate x DSC of 30.00% x $ 1,696.12 = $ 508.84 <br /> Reimbursables: <br /> Itemized <br /> Laboratory Services = $ 840.00 <br /> Traffic Control Plan and Flaggers(cost+ 5%) = $ 2,100.00 <br /> Private Utility Locate(cost+ 5%) = $ 567.00 <br /> Drill Rig &Concrete Coring (cost+ 5%) = $ 5,250.00 <br /> Total reimbursables = $ 8,757.00 <br /> SubConsultants Total: _ $4,899.83 <br /> Contingency = $ 2,000.00 <br /> Grand Total $ 15,656.83 <br /> Prepared By: Mike Rundquist Date: 2/1/2018 <br /> DOT Form 140-089 EF Exhibit G-1 <br /> Revised 01-09 <br />