|
; , � �, �; , �� -� IRRIGATION LEGEND IRRIGATION
<br /> ,,EXG. BLDG �--� � -�XG. BLDG � � NOTE�
<br /> �- :� CHAIN LINK FENCE � � � � � 1. Irri ation desi rn and la
<br /> � "" � ALONG PROP LINE � -� ,, SYMBOL MANUFACTURER PSI RADIUS GPNI LOCATION g � yout asstlines minimum 50 Ibs. static water pressure 45 GPM at point of connection. Verify PSI and GPM, if
<br /> -x X _ discrepancy exists repott to Lanciscape Architect ai2d owner before proceecling.
<br /> NOTE: 2.The Landscape Contractor shall inspect the site anci verify existing conditions and dimensions prior to bidding and construction.
<br /> \ USE 6" POP-UP HEIGHT HEADS ADJACENT TO FIEAD IN PAKKINC'i STALLS. USE 12" HEIGHT 3. Landscape Architect Yo have 48 hour notice to review pressure test for project. Provide owner with Baekflow Certification �for revie�v �
<br /> and approval.
<br /> �p � POP-UP HEADS IN ALL OTHER LOCAT'IONS. CONNECT �INTO BO�I'"�'OM INLET' OF 12" POP-UP 4. Irrigation plan is diagra�nmatic. Adjust pipe, valves and ir�i•igation heads according to field conditions and plant locations. Report any
<br /> HEADS. discrepancies to�Landscape Architect. All irrigation valves to be placed on property, no izrigation control valve�s ro be plaeed in Right of
<br /> 2� .78-5 #4 � RAIN BIRD 18�12 W/15F MPR PLASTIC NOZZLE 30 15' 3.70 SHRUB W�Y•
<br /> � 1" 30 5.Coordinate irri ation oints of connection and location of automatic controller 4vith General Contractor. 1" Water M'eter b General
<br /> x Qc �I _ RATN BIRD 1812 W/15H MPR PLASTTC NOZZLE 30 I S' 1.85 SHRUB g p Y
<br /> �_ � � X � � R�1IN BIRD 1812 W/15Q MPR PL�STIC NOZZLE 30 15' 0.93 SHRUB Contractor. Coordinate all work with other trades involved. �a 1,. •
<br /> � - 6. All valves will be placed in valve bo�es in amanner whieh facilitates access for malntenance. Loeate valves in shrub and ground cover 11C111111 R. BethUlle
<br /> ��� � beds unless approved by Landscape �lrchitect. No valve boxes in lawn areas. ASs�ela.tes� lYlC.
<br /> � RAIN BIRD 1812 W/12F MPR PLASTIC NOZZLE
<br /> W � 30 12' �.60 SHRIJB 7. All components of irrigation system shall be installed and adjusted to provide adequate coverage and no over spray onto buildings, �C+T A
<br /> I I � RAIN BIRD 1812 W/12H MPR PLt�STIC NOZZLE 30 12' 130 SHRUB windows,or paved�reas. Contractor is t�esponsible for providing a complete�vorl:ing irrigation system. �JL.�1
<br /> � EZAIN BCRD 1812 W/12Q MPR PLASTIC NOZZLE 30 12' 0.65 SHRUB 8. Conn�actor is responsible for any damages to build�ing ancl infrastruct�ire dui�ing landscape construction.
<br /> � � aUTOMATIC �� 9. Btuy control wires below mainl�ine and tape to mainline every 10' o.c.
<br /> CONTROLLER ( � RAIN BIRD 1812 W/I OF MPR PLASTiC NOZZLE 10. Flush mainline before installing valves. Flush zone lines befor•e installing nozzles. Test entire system before back filling trenches.
<br /> � PP � 30 10' 1.57 S�IRUB LANDSCAPE ARCHITECTURE
<br /> �� , l I. Electi�ic Valves and Backflow prevention assembly to be placed in below grade valve boYes and installed in shrub beds. Verify that
<br /> I � TUNNEL UNDER 0 RAIN BIRD 1812 W/10H MPR PLASTiC NOZZLE 30 10 0.78 SHRUB
<br /> valve boxes are not placed where plantmaterials aee to be installed. Provide sleeving under a(1 paved surFaces. 8z PI,ANNING, ASLA
<br /> EX'C SIDEWALK TO � RATN BIRD 1812 W/lOQ MPR PLASTIC NOZZLE 30 10' 0.39 SHRUB 12.Provide fiill covel•age to all lawn and shrub beds. Install additional irrigation heads as necessary to achieve full coverage and water to
<br /> PLANTER ��
<br /> ( all plantings.
<br /> � CONG � ( -�- RAIN B�IRD 1812 W/9SST MPR PLASTIC NOZZLE 30 9'Yl8' 1.73 SHRUB 73. 120 f1C Eleatrical power so�irce at controller location shall be providecl by General Contractor. The Landscape Contractor shall make
<br /> ��PAD�. � RAIN BIRD �l 812 �V/7 SSST MPR PLAST[C�NOZZLE 30 4'x30' 1.21 SHRUB the final connection from the electrical sotlrce to the controller. Al�l�viring per L& I Codes.
<br /> � � �� Q RAIN BIRD �l S 12 WIISEST MPR PLAST`IC NOZZLE 30 4'x15' 0.61 SHRUB 14. All irrigation heads to be installed perpendicular to finish grade unless otherwise specified. Place all lawn heads in lawn areas, 3"froin
<br /> � ��� edge of paving or bedline. Place all shrub heads in sl�rub beds,min. 4"froln beciline and min. 10"from all struct«t�es. CONNECT INTO P.O. Box 1442
<br /> 1 1/2" SL� _ � WOOD� �� _ _ _ _ BOTTOM INLET OF 12" POP-UP HEADS. Ma le Valle Washin ton 98038
<br /> � ---- - �ENCE _.._,._.:_.._:._.._.:3••- DRIP LINE: MAXIMUM 18" WIDTH BETWEFN DRIP LINF,S l5. Winterizing the system: The irrigation contractor shall install a manual drain valve assembly. Draining the mainline shall be p �'' �
<br /> �_���_-___ � ii- �
<br /> � � AC ° ' ; � _ LOT RAINBTRD DRIP LINE AND REQUIRED AIR/Vt�CUUM 30 TBD 1.50 SHRUB accom lished b introducinff com tessed air into the s stem throti h the uick cou (er valve at the oinY of connection.
<br /> � � - - - ' - - LIGHT 16.Demonstrate working system o bu�ilding maintenance manage r�pon completion and acceptancep phone: (425) 432-9877
<br /> �� GAS I � RELIEF VALVES, IN-STEM FILTERS, DIFFUSER BUG
<br /> � � 1� POWER CAPS AND OTHER RE UIRED E UIPMENT TO fax:
<br /> � �: MEiER METER 23.46-5 #3 ( PROVIDE COMPLETE�COVERAGB OF PLANT 17. Locate al; utilities before digging. Call l-(800)424-5555. (425) 432-9878
<br /> � � j� 1" 30 �� 1 S. Install irrigation system in accordance tivith all applicable codes and ordinances.
<br /> NIATBRIAL. 19. Motlnt Rain Sensor near top of building. Place in approved location�vith Lanclscape Architeck. e-mail :
<br /> � SIGN 20. From controllec• install 3M-14 �au e sin le sti�ancl direct btlr wire DBY with one s are ello�v wire and one cornmon wire to e�cl� lauch@bethuneassociates.com
<br /> �I � �I �] RAINBIRD PEB SERIES AUTOMATIC CONTROL VALVE, SIZE PER PL�N t�ND PROVIDE a g g Y � ) F� Y
<br /> valve box�vith connections and schedule 80 unions. All rvil�e s lices to be for wire connections: DBY-Direct Btu S lice b 3M. ��'•bethuneassociates.eom
<br /> fj I U AMETEK CONTROL BOX& MIN.2 CiJ.FT. WASHED PEA GRAVEL. p � y p y
<br /> � � 1031 EVERETT MALL WAY 21. Contractol�to provide PDF File�s-builY dra�vings to Landscape Aechitect prior to close-out of job.
<br /> � � � RATNBIRD PEB SERIES ,�UTOMATIC CONTROL VALVE, S[ZE PER PLAN AND RA[NBIRD 22. Electt�ical control �vires to be spliced in cotitt�ol boxes only.
<br /> � � � j EXtSTING PLEINTER: PRESERVE AND � , DRIP LINE VALVE-PER MANUFACTURE SPEC. PROVIDE AMETEK CONTROL QOX& MIN.
<br /> 22. As halt and/or concrete to be removed 2" fr•otn behind extruded curb or sidewall<in lanter.
<br /> w � j PROTECT EX'G PLANT MATERIAL. �'� 2 CU.FT. WASHED PEA GRAVEL. p p
<br /> � o � PLACE DRIP�IRRICf1TION AT BASE OF �( � 23. Install rock outcrops and/oi•dry creek beds prior to inst�ilation of irrigation.
<br /> OF EX'G PLANT MATERIAL. MULCFI � � O WATER PRESSURE REDUCING VALVE- WATTS SERIES 115, USB, SIZE PER P.O.C. DETAIL 24. Provide one (�1)year warranty for parts, matel�ials and worlananship upon fina(acceptance date from owner for work completed per
<br /> " � �� Il�rigation Plan.
<br /> Z PER PLANTING PLAN.
<br /> X �� � ���� � e MUELLER BRASS tSOLATION VALVE, SIZE PER POINT OF CONNECTION DETAIL, 1NSTALL 25. Verify on-site undergrotmd vault locationper Civil Engirieel•prior to conskruction. A(I mainlines to be buried min. 18" depth below
<br /> w � � j UITE 100 SUITE 101 � ��s � ?�, [N ROUND 6" AMETEK, PER�DETAIL. grade; lateral lines to be buried min. 12" depth below grade.
<br /> 26. Sprinkler heads adj�cent to head in parking, to be set on parking lot stripe. � M
<br /> ,�► #5 DRI P-S � � c-� �
<br /> � 5 5.0 ;� � � � � P.� FEBCO DOUBLE CHEC[< VALVE, SIZE PER POINT OF CONNECTION DETAIL, INSTALL IN � �/�
<br /> �m � i�
<br /> I o-' 3" SL--'i �i _ _ _- �f � `�`� Lf1RGE t�METE[�CONTROL BOX,PER DETAIL. � �
<br /> '�'=��_��_�� -� ��= ��� �� �����=��_ � ° Q �� IRRIGATION LINE AND SLEEVE SIZING a Q
<br /> �••-••-•• �• •• O � RAINBIRD UICK COUPLER VALVE 44RC,ASSUNIE I UNLESS OTHERWISE NOTED ON PLAN.
<br /> :_ ._ . �
<br /> Lo�.. _-._ Y Tji �I ,
<br /> , �r-3".SL � ' ��'i � QC PROVIDE HOSE SWIVEL. INSTALL PER DETAIL
<br /> �':�T-=- - __- k�L -'••=� ..- ` CLASS 200 P�C LATERAL LINE
<br /> _���-
<br /> d RALNBIRD ESP-LX MODULAR SBRIES-8 STATION AUTOMATiC CONTROLLER. EXTERIOR MOUNT,
<br /> � � �"�� 1" ML 3" SL� PP aC COORDINATE LOCATION PER OWNBR APPROVAL. PROVIDE CONDUIT TO POWER SOURCE AND 3/4" LINE UP TO 10 GPM FRICTION LOSS/100'=4.3(
<br /> � � ! �i � `' CONNECT TO POWER SOURCE. 1" LINE BETWEEN 11-15 GPNT FRICTION LOSS/100'=3.1 1
<br /> I � � I � ° I "1/4" LINE BETWEEN 16-2� GPM FRICTION LOSS/100'=2.45 STATE OF
<br /> � i � � i H C ( � GLEN HILTON MC MINI CL[CK II RAIN SENSOR WITH BY-PASS S WITCH. INSTALL PER OWNER. 1 1/2" LINE BETWEEi�f 26-35 GPM FRICTION LOSS/l00'=220
<br /> 2" LINE BETWEEN 35-60 GPM FRICTION LOSS/l00'= 1.72 WASHINGTON
<br /> " � / } 2 1/2 LINE OVER 61 GPM FRICTION LOSS/100' = 136 REGISTERED
<br /> RIP-S #1 _ 2" MAIN SCNEDULE 40 PVC M�1iN LINE, SIZE PER PLAN.MIN. DEPTH l8" BELO�� FINISHED GRADE. t� � �� ���
<br /> S.0 5
<br /> MAILBOX � � 23.93-5 �'2 3�`��� CLASS 200 PVC LA'T'ERAL LiNE, SI7E PER PLAN, NtIN. DEPTH 12" BELOW FINISFIED GRAUE.
<br /> � " SCHEDiJLE 40 PVC MAIN L1NE
<br /> R � POINT OF 1" 30 --2 S�= - SCHEDllLE 40 PVC SLEEVING, SIZE PER PLAN, MIN. DEPT�I 18" BELOW FINISHED GRADE FOR MAIN LINE.
<br /> --T_
<br /> CONNECTION ( `� SCHEDULE 40 PVC SLEEVtNG, SIZE FER PLAN, MIN. DEPTH 12" BELOW FINISHED GRADE FOR LATERAL LINES. 3/4" LINE UP TO 10 GPM FRICTION LOSS/100'=5.14 I�A. HLII� R. �E'I'�UN�
<br /> o P (�SEE DETAiL} � 1° LINE SETWEEN 1 1-15 GPM FRICTION LOSS/100'=3.36
<br /> . � 1 114° LINE BETWEEN 16-25 GPM FRICTION LOSS/100' =2.72 CERTIFICATE N0. 462
<br /> VALVE KEY � 1,��� L[NE BETWEEN 26-35 GPM FRICTtON LOSS/100' =2.28
<br /> MH EXG. SIGN � ' � 2"LINE BETWEEN 35-60 GPM FRICTION LOSS/100'= 1.74
<br /> �
<br /> � , . ..�� i , , ,-,
<br /> 2 ll2" LINE OVER 61 GPM FRICTION LOSS/100'= 1.56
<br /> � vALVE 1vu�vt�ER � ALL MAINLINE SLEEVING TO BE MINIMUM 4"
<br /> `- ,, �.� , - '" �-VALVE GPM(GALLONS PER M[NUTE} REVISIONS
<br /> � X .. / ' , �
<br /> X � �" .� �2 �'S.�d-�� �°S° IriC�ICat2S S�lYtlb 20110, ut,u I11C{1Cat0S �,aWl1 20118�
<br /> �" � '� `/' ,-- - 30 1 U2" �_-vaLVE stzE SCHEDULE 40 PVC SLEEVING
<br /> � � `0 `� i , - ' , � VALVE PSI(OPERATING PRESSURE) ] l/2" LINE [IP TO 10 GPM
<br /> . d,y 5' i� �I
<br /> � ' 2"LINE BETWEEN l 1-IS GPIV1
<br /> ST.
<br /> � ��� �° ��° � , �'�WM � LIGHT , � � ' 2 1/2" SLEEVE BETWEEN 16-25 GPM
<br /> r-�`,, , ,
<br /> � � ,- - , 3" SLEEVE BETWEEN 26-35 GPM
<br /> �.ti � � � � ��TEL MH P��wP'� � ' ' �� ��T (� 4" SLEEVE BETWEEN 35-60 GPM
<br /> ` y�';, ,cc�ss�� �R�( �` - � - �� �' POINT QF C�OIV 1�I E��TI�JN DETAIL 5" SLEEVE OVER 6I GPM
<br /> � �
<br /> U. ° - P �
<br /> � � ;_ ,,,��Re���� < , - �� - � � ��i RAINBIRD PEB SERIES CONTROL VALVES
<br /> �/ - ! =// 1 WATER METER BY OTHERS ��
<br /> � 3/4 VALVE UP TO 17 GPNI
<br /> �� � , � " � � (WATER PRESSURE REDUCING VALVE - WATTS) 1" V�1LVE BETWEEN 18-25 GPIVI
<br /> � ,r<�� � , '
<br /> � � � � 1" STOP VALVE - MUELLER 1 1/2" VALVE BETWEEN 26-64 GPM
<br /> SCHEDULE 80 PVC UNION 2° VALVE OVER 65 GPNI
<br /> LANDSC�APE IRRIGATION PLAN � � _ _ � �
<br /> �
<br /> 0' 10' 20' 40' 80' 1" DBL CHECK ASSEMBLY 1 1/4" MAIN LINE
<br /> MANUAL DRAIN VALVE QUICK COUPLER 1"
<br /> SC�LE: 1"-20'-0" NORTH
<br /> EVERETT
<br /> BASE MAP FROM: PARKING LQT
<br /> BARGHAUSEN CONSULTING ENGINEERS, KENT, WA. PROVIDE MIN. 18�� LENGTH
<br /> *ONE COMMON WIRE 30-INCH LINEAR LENGTH OF WIRE,
<br /> *ONE SPARE-YELLOW WIRE � WAT�RL PROOF CONNECTION
<br /> (1 OF 2)
<br /> AMETEK VALVE BOX WITH COVER:
<br /> FINISH GRADE/7oP oF MULCH FINISH GRADE DOUBLE CHECK FINISH IGRADEI TOP OF MULCH �
<br /> � = 1031 EVEREI I'MALL W�Y �
<br /> QUICK-COUPLING VALVE: ASSEMBLY � _`J "` REMOTE CON ROL VALVE:
<br /> RAIN BIRD MODEL 7 0�_3„ PER LEGEND � f�.�� EVERETT WASHINGTON P�
<br /> VALVE eOX WITH COVER: SHRUB/LAWN SCHEDULE 8Q MA�E ADAPTER RAIN BIRD PEB �
<br /> 6-INCH SIZE 3" MIN. `s�
<br /> ����� ��''� 3-INCH MINIMUM DEPTH OF •' (1 OF 2) �_ PVC SCH 80 NIPPLE (CLOSE) �
<br /> t 3/4-INCH WASHED GR,4VEL v j '` '` �'°'` CONC/PAVWG EDGE
<br /> SCHEDULE 80 UNION PVC SCH 40 ELL ��
<br /> JUMBO VRLVE BOX �
<br /> SUBGRADE � ,� 4E� � FINISH GRADE/TOP OF MULCH (1 OF 2)
<br /> ���� SCH. 80 UNIONS (1 EA. SIDE)
<br /> PVC SCH 80 NIPPLE 'r i VALVE BOX
<br /> PVC SCH 80 NIPPLE
<br /> (LENGTH AS REQUIRED) POP-UP SPRAY SPRINKLER: o SCHEDULE 80 90' ELL � (LENGTH AS REQUIRED
<br /> PVC SCH 40 STREEf ELL RAIN BIRD 1800 � � '�� BRICK (1 OF 4) > �
<br /> W/PLASTIC MPR NOZZ�E (1 OF 4� �-_-� �.'�� �,` v����^�� �
<br /> - 4" POP-UP HEAD (LAWN) PRESSURE SCHEDULE 40 PIPE °
<br /> PVC SCH 80 NIPPLE 12" POP-UP HEAD (SHRUB) REDUCING VALVE (TYPICAL) SCH 80 NIPPLE (2-INCH LENGTH,
<br /> HIDDEN) AND SCH 40 ELL
<br /> LENGTH AS REQUIRED) (SEE LEGEND) 12�� QUICK COUPLER
<br /> BRASS BALL VALVE
<br /> _ PVC SCH 40 STREEf ELL DO NOT CONNECT INTO SIDE- MANUAL DRAIN VALVE LAND:SCAPE
<br /> PVC SCH 40 TEE OR ELL PORT OF HEAD 1 O" ����,-, �� C3 PVC MAINLINE PIPE
<br /> PVC MAINLINE PIPE POLY PIPE ���������Y����} C 1r����.J �'��������� c i� �
<br /> .1
<br /> �- PIPE FROM POINT 2 CU. �. WASHED PVC SCH 40 TEE OR ELL IRRIGATION
<br /> OF CONNECTION GRAVEL SUMP IRRIGATION MAINLINE PIPE PVC SCH 40 MALE ADAPTER PLAN
<br /> PVC SCH 40 ELL
<br /> � PVC MAINLWE PIPE
<br /> 2" x 2" CEDAR STAKE W/
<br /> PVC LATER,4L PIPE
<br /> STAINLESS STEEL GEAR
<br /> CLAMPS OR EQUIVALENT NOTE: Pvc LATERAL PIPE NOTE: 3.0-INCH MINIMUM DEPTH OF
<br /> 3/4-INCH WASHED DRAIN ROCKS
<br /> SUPPORT SYSTEM PLACE ALL LAWN HEADS IN LAWN AREA, MIN. 3" FROM EDGE OF
<br /> NOTE: • 1. INSTALL BACKFLOW PREVENTER AS REQUIRED BY LOCAL CODES AND HEALTH JOB NO. ttZ 1 C 1(�O
<br /> 1. FURNISH FITTINGS AND PIPING NOMINALLY SIZED IDENTICAL TO PAVING OR BEDLINE. PLACE ALL SHRUB HEADS (N SHRUB BEDS DEPARTMENT. VERIFY LOCAL REQUIREMENTS PRIOR TO INSTALLATION.
<br /> NOMINAL QUICK COUPLING VALVE IN�ET SIZE. MIN. 3" FROM BEDLINE, AND MIN. 10'� FRQM ALL STRUCTURES. � 2. INSTALL PRESSURE REDUCING VALVE AS NECESSARY FOR FI OW CONTROL.
<br /> O DO NOT CONNECT INTO SIDE PORT OF HEAD C O N D U C T F L O W T E S T P R I O R T O I N S T AL L ATION OF IRRIGATION PIPE AND HEADS.
<br /> ��T�IL: G2UIGK-GOU�LINC VA�LY� 1��T�IL: POP-UP SPR�Y SP�INKLER D�T�IL: B�GK�LOW i�REV�NT�i� I��T�II�: fiZ�MOTE GONTfi�OJ� 1�P�L�I�
<br /> NO SCALE NO SCALE NO SCALE NO SCALE sca1,E: i°=zo�-o�� s�ET
<br /> DATE: 12/14/16
<br /> FOR S UBMITTAL ONLY D��N: LJL
<br /> N{�T FQR CONSTRU c�: L� L Z .�
<br /> �Z�O� ��� COPYRIGHT 2016
<br />
|