My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County Human Services 3/6/2018
>
Contracts
>
6 Years Then Destroy
>
2021
>
Snohomish County Human Services 3/6/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 9:37:51 AM
Creation date
3/27/2018 9:37:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County Human Services
Approval Date
3/6/2018
Council Approval Date
2/21/2018
End Date
8/31/2021
Department
Planning
Department Project Manager
Rebecca McCrary
Subject / Project Title
2016 CHIP HOME Funds
Tracking Number
0001110
Total Compensation
$124,010.00
Contract Type
Agreement
Contract Subtype
Grant
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. Agreement by the contractor to comply with all the requirements of <br /> Section 114 of the Clean Air Act, as amended (42 U.S.C. § 1857c- <br /> 8), and Section 308 of the Federal Water Pollution Control Act, as <br /> amended (33 U.S.C. § 1318), relating to inspection, monitoring, <br /> entry, reports, and information, as well as all other requirements <br /> specified in said Section 114, Section 308, and all regulations and <br /> guidelines issued thereunder; <br /> iii. A stipulation that, as a condition for the award of the contract, <br /> prompt notice will be given of any notification received from the <br /> Director, Office of Federal Activities, EPA, indicating that a facility <br /> utilized or to be utilized for the contract is under consideration to be <br /> listed on the EPA List of Violating Facilities; and <br /> iv. Agreement by the contractor that it will include or cause to be <br /> included the criteria and requirements referred to in this section in <br /> every non-exempt subcontract, and that it will take all appropriate <br /> actions to enforce these requirements. <br /> b. In no event shall any amount of the assistance provided under this <br /> Agreement be utilized with respect to a facility which has given rise to <br /> a conviction under Section 113(c)(I) of the Clean Air Act or Section <br /> 309(c) of the Federal Water Pollution Control Act. <br /> H. Displacement; Relocation <br /> The Agency shall comply with the displacement, relocation, and acquisition <br /> requirements under 24 CFR § 92.353 where applicable. <br /> I. Lead-Based Paint <br /> The Project shall be conducted and administered in compliance with the <br /> Lead-Based Paint Poisoning Prevention Act (42 U.S.C. §§ 4821-4846), the <br /> Residential Lead-Based Paint Hazard Reduction Act of 1992 (42 U.S.C. <br /> §§ 4851-4856), and implementing regulations at 24 CFR Part 35, subparts A, <br /> B, J, K, M, and R, and with any and all applicable laws, regulations or <br /> standards hereafter enacted or issued with regard to lead-based paint. <br /> J. Procurement Contracts <br /> 1. The Agency is subject to Federal procurement requirements contained in <br /> the applicable uniform administrative requirements as set forth at Exhibit A <br /> Section II-A of this Agreement. <br /> Exhibit A-2 <br /> HCS-16-42-1601-198(2) <br /> City of Everett <br /> Page 7 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.