My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alternative Technologies 3/15/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
Alternative Technologies 3/15/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 10:10:33 AM
Creation date
3/27/2018 10:10:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alternative Technologies
Approval Date
3/15/2018
End Date
6/30/2018
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
Hazardous Materials Survey South Precinct
Tracking Number
0001116
Total Compensation
$3,150.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> The purpose of this contract is a hazardous materials assessment for the South Precinct-911 lease space and <br /> adjacent storage area located at 1121 SE Everett Mall Way.Each area is approximately 5,000 square feet and are <br /> located adjacent to each other at the southwest corner of the second floor. <br /> Summary of the Scope of Work <br /> The work shall incude the required pre-renovation Asbestos Good Faith Inspection,AGFI,including random lead <br /> paint sampling and a light fixture inventory so that the hazardous materials:asbestos,lead,mercury and <br /> polychlorinated biphenyls,PCB,can be identified for worker protection during any work activity that may disturb <br /> these materials. <br /> A breakdown of the Scope of Work is as follows: <br /> 1. Asbestos: <br /> a. Conduct a Asbestos Good Faith Inspection-AET RFP 3171. <br /> b. Sampling and analysis of an estimated 25 PLM Samples at$15 each. <br /> c. Sampling and analysis 5 point count 400 samples at$65 each. <br /> d. Cost Estimate-$1,500 <br /> 2. Lead: <br /> a. Ramdom lead paint samplings and analysis- 10 samples at$35 each. <br /> b. Lead results included with AGFI report. <br /> c. Cost Estimate-$750 <br /> 3. Hazardous Chemicals: Hg&PCB <br /> a. Flourescent light fixtures tubes(Hg)and Ballasts(PCB,Polychlorinated Biphenyls). <br /> b. Light fixture component inventory with AGFI report. <br /> c. Cost Estimate-$500 <br /> 4. Time for Completion: <br /> a. The standard turn around for analysis is typically 10 days,and the certified interpretive report would typically <br /> be delivered in 21 business days from the date of Notice to Proceed,NTP. <br /> Page 12 <br /> (Form Approved by City Attorney's Office January 7,2010,updated November 21,2016) <br />
The URL can be used to link to this page
Your browser does not support the video tag.