Laserfiche WebLink
Kirk Brooks <br /> From: Michael Brick <br /> Sent: Friday,April 17,2015 3:44 PM <br /> To: Kirk Brooks <br /> Subject: 6101 Associated Traffic Mitigation Fee <br /> hdat-wood/ 6'01r l.afr) <br /> Kirk, <br /> The traffic mitigation rate for this project is: <br /> $0.755/SF(or$755/1,000 SF) <br /> This rate is based on the old SW Everett Subarea fee of$1,006 per PM Peak Hour trip,which was not updated with the <br /> TMO update last year and has not changed. <br /> If you have any other questions let me know and I'll answer them Monday. <br /> Michael Brick, P.E. <br /> Associate Traffic Engineer <br /> City of Everett Public Works <br /> (425)257-7790 <br /> PI/ <br /> 257 /% <br /> K <br /> / its 1c3as 710 V' 56e7 <br /> p�,,� u�Q :ave <br /> 2 svetwe tri- = ZOO 6/4- <br /> 2c o 6/ 1 X D. 75-g = 157, 46.5 —' <br /> Cr°04 Ike is fG,is Correct <br /> Okc1 Per kv\► Ica - " -z z -1 <br />