Laserfiche WebLink
INSPECTION REPORT <br /> a <br /> Date -2�� Permit: P 671) [ i QC /-I <br /> vor <br /> Contractor: <br /> P )''' Owner: -- — ----_--_ — _ <br /> Site Address: 6 ( _.__ji4-_---6, —T <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL P MBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab Ii •undwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ■Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION:• <br /> ❑ APPROVAL •_: AL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ►4 CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. • VIOLATION <br /> ❑ UNABLE TOPERFO• INSPECTION: <br /> ❑ CALL(425)257-888 FOR REINSPECTION—24 hour notice requi ed <br /> j S7` , 17-- ±_y <br /> .00, - 6 rut_ <br /> TA-al\-( <- Li:Ai -Q.., <br /> pi-PE 1-41-7-e- . <br /> Inspector: Date: <br /> 5 "."--.-- <br /> EIR(10/06) DA BAR,INC. <br />