My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6201 ASSOCIATED BLVD BASE FILE 2018-03-29
>
Address Records
>
ASSOCIATED BLVD
>
6201
>
BASE FILE
>
6201 ASSOCIATED BLVD BASE FILE 2018-03-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 1:19:21 PM
Creation date
3/27/2018 10:37:23 AM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6201
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,, <br /> AGENERAL NOTES: i <br /> Guardrail I Fence <br /> Rockery construction shall be performed in accordance I Per City Standards <br /> with the Associated Rockery Contractor Guidelines. <br /> Parking Stall <br /> Rockery construction is a craft.The skill and experience Rock Size per (250.pst) <br /> of the builder will largely dictate the success of the Geotechnical Engineer <br /> construction. g <br /> V <br /> and ARC Guidelines4__ V. V <br /> A rockery is a protective system with respect to the , <br /> weathering and erosion process on an exposed soil face. i o , 2' max. <br /> Maximum rockery height Fl= 9 feet <br /> . '' .o ".. .... .. ... <br /> GEOGRID SOIL REINFORCEMENT •e. • <br /> I - '!po >2 <br /> Miragrid 5XT or equivalent. <br /> • -. ..,-- ,, !r1..i. .. ..i;01......,..-...r <br /> ,..:....i <br /> STRUCTURAL GEOGRID INSTALLATION• <br /> 6 <br /> Geogrid shall be oriented with the highest strength '. 2' Reinforced <br /> axis perpendicular to the rockery alignment H' -'•� .-0 Fill <br /> Geogrid Reinforcement shall be placed at the strengths, ' a •0 . -.. <br /> lengths and elevations shown on the construction design " `'0 °•.. 2' <br /> drawings or as directed by the Engineer. - ? .s.r, .; <br /> _,. ..,,• _ LR— <br /> The geogrid shall be laid horizontally on compacted .y. --0, <br /> backfill and extend to the back of the rockery.The - •"'•:'.; <br /> off`- �`° , <br /> geogrid shall be pulled taut,and anchored prior to ,e 2' <br /> backfill placement on the geogrid, K _ fl.•;:..,• <br /> Geogrid Reinforcements shall be continuous throughout 1 0 �'°- <br /> their embedment lengths and placed side-by-side to - _.. I••�" <br /> provide 100%coverage at each level.Spliced connections 12"min: 0 a <br /> between shorter pieces of geogrid or gaps betweenJ <br /> adjacent pieces of geogrids are not permitted. r:; I•�('—I I • <br /> I I <br /> REINFORCED BACKFILL PLACEMENT <br /> Tracked construction equipment shall not be operated directly upon the <br /> Reinforced Backfill shall be placed,spread an compacted geogrid reinforcement.A minimum fill thickness of 6 inches is required <br /> in such a manner that minimizes the development of slack prior to operation of tracked vehicles over the geogrid.Tracked vehicle <br /> in the geogrid and installation damage. turning should be kept to a minimum to prevent tracks from displacing <br /> the fill and damaging the geogrid. <br /> Reinforced Backfill shall be placed and compacted in lifts <br /> not to exceed 6 inches where hand compaction is used, Rubber tired equipment may pass over geogrid reinforcement at slow <br /> or 8-10 inches where Heavy compaction equipment is used. speed,less than 10 mph.Sudden braking and sharp turning shall be <br /> Lift thickness shall be decreased to achieve the required avoided. <br /> density as required. <br /> At the end of each day's operation,the Contractor shall slope the last <br /> Reinforced Backfill shall be compacted to 90%of the lift of reinforced backfill away from the rockery to direct runoff away from <br /> maximum density as determined by ASTM D-1557-02. wall face.The Contractor shall not allow surface runoff from adjacent <br /> The moisture content of the backfill material prior to and areas to enter the wall construction site, <br /> during compaction shall be at or near the optimum <br /> moisture content. FIELD QUALITY CONTROL <br /> Only lightweight hand-operated equipment shall be allowed The rockery construction shall be observed by the Geotechncial <br /> within 3 feet of the back of the rockery. Engineer on a periodic or full-time basis as appropriate.Testing of the <br /> compacted backfill shall be performed by the Geotechncial Engineer. <br /> LEGEND: ��. � --- <br /> Earth I i% lll.r� � � Lr sc <br /> Q•.4 , a Drainage materials to consist of clean angular <br /> solutions. <br /> o Q well-graded quarry spalls,with 44nch maximum NW rut irk ring Consrnin.cton Moritaonh f, <br /> _6. cztirrr&ne41 Sclar"ers <br /> size,or other material approved by the geotechnical <br /> engi — <br /> neer. _ - _-__-..-_-_:__... - - ------- <br /> E fl.- Undisturbed firm Native Soil. REINFORCED ROCKERY-SURCHARGE CONDITION <br /> III - Underwood Gartland -Wet Ponds <br /> oDrain pipe;4-inch minimum diameter,perforated -- - - Everett, Washington <br /> or slotted rigid plastic PVC pipe,laid with a positive ` <br /> gradient to discharge under control,well away from _ - <br /> the wall. .Dlwn. GLS Date 04/01/2015 Proj. No. 2232.02 <br /> Checked RAC Date April 2015 Plate 2 <br /> Yr3V2.„ji <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.