Laserfiche WebLink
ENGINEERING <br /> PUBLIC SERVICES DEPARTMENT <br /> June 21, 2017 <br /> Jeff Vander Pol <br /> j effvp©a b bottco n stru cti o n.co m <br /> Abbott Construction, Inc. <br /> 3408 1st Ave South, STE 101 <br /> Seattle, WA 98134 <br /> RE: Owner: Community Health Center of Snohomish County <br /> Job Address: 8609 Evergreen Way <br /> Plan Check Number: B1706-031 <br /> Dear Mr. Vander Pol, <br /> In response to your application for a construction permit, your plans have been examined and you <br /> are advised that revisions may be necessary before a permit can be issued. Please review and <br /> respond to the comments below. These comments address building issues only. Additional <br /> revisions or additions may be required by other departments (such as Public Works, Planning, or <br /> Fire). All references refer to the 2015 International Building Code (IBC), as amended by the State <br /> of Washington and adopted by the City of Everett. The current IBC referenced standard for <br /> accessible design is the 2009 "Accessible and Usable Buildings and Facilities" (ICC/ANSI A117.1). <br /> Federal ADA regulations and standards may be more restrictive. All required submittals must be of <br /> sufficient detail and information to ensure that the proposed structure will be constructed in <br /> compliance with all adopted codes. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two complete new sets of construction documents <br /> reflecting the corrections requested. All revisions require the person delivering the <br /> drawings to replace the revisions into the two sets here at our offices. For significant <br /> revisions, or if the revisions are coming directly from a document printing facility, <br /> please make arrangements with them to print and deliver two replacement sets. <br /> Structural <br /> 1. It appears that the special concentrically braced frame system being provided is being <br /> designed per the IBC 2015. Please show how the redundancy factor, p, is satisfied per <br /> ASCE 12.3.4.2. to equal 1.0. <br /> 2. On Sheet S2.1, it appears that new the addition of micropiles are being installed adjacent <br /> to existing footings for the new steel braced frame columns. Please provide details and <br /> supporting calculations that address: <br /> a. where the new micropiles are occurring in elevations. Please address if the top of <br /> these thickened footings are above the existing footing or are intending to match <br /> the existing top of footing elevations. <br /> Page 1 of 2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax (425) 257-885 <br />