Laserfiche WebLink
b INSPECTION REPORT <br /> ' D-,_:cor <br /> ate 1,_1/ ,i Permit k `b \ <br /> Q <br /> Contractor: �(�,� __IJV`' <br /> Owner: Ca`l \`\\V%` -\ J " <br /> Site Address: ��S 2Qe- 'vk +Ale.- <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> C1 Temp Service ❑UFER ground ❑Groundwork/SlabCLoundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> []Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Li Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building 1Final ❑Gas PipepeFinal ❑HWT Final <br /> OT- - •R I: SULTATION: /-CAO- *MC,-1\ 1L <br /> f a APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> 4 OK FOR T.•.O. ❑ CORRECTION REQUESTED <br /> •• •- C.O. ❑ VIOLATION El <br /> [ UNABLE TO PERFORM INSPECTION: <br /> [1 CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: ff-7 Date: 1 ...- sp,..3/‘ --17 <br /> E_IR(10/06) DATABAR,INC. <br />