My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4201 RUCKER AVE COMMUNITY HEALTH CENTER 2019-04-10
>
Address Records
>
RUCKER AVE
>
4201
>
COMMUNITY HEALTH CENTER
>
4201 RUCKER AVE COMMUNITY HEALTH CENTER 2019-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2019 9:26:24 AM
Creation date
3/27/2018 12:05:11 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4201
Tenant Name
COMMUNITY HEALTH CENTER
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR COMMEarS ON <br /> LAND USE APPLICATION <br /> Project#: REVII17-013 <br /> Project Planner:KEMBRA LANDRY <br /> To: Engineering/Public Services Reviewers <br /> From: SABRINA FANDLER,Development Technician <br /> Date sent: 7/12/2017 <br /> Project#: REVII17-013 <br /> Associated project#(s): <br /> Proposal: Parking Modification <br /> Location: 4201 RUCKER AVE <br /> Applicant: Community Health Center of Snohomish County <br /> • Share Point Link to attachments if electronic submission: (copy&paste into your browser) <br /> https://ftp.everettwa.gov/?ShareToken=C695560F555B5A3F0F53A91 DDDB87981E60EACB5 <br /> Return your comments to SABRINA FANDLER by 6/12/2017. <br /> (Even if your response is "No Comment") <br /> COMMENTS: (Please write directly on this form) <br /> Name&Date: Arnie Roshak 6/5/17 <br /> Provide quantities for amount of impervious that will be added or replaced. Interim policy 2-11 will apply for projects <br /> that add or replace more than 2,000 sf of impervious area. <br /> Show existing drainage structures and pipes and any modifications to site drainage on the site plan. Show how the <br /> proposed site will drain to the on-site storm drain collection system and combined sewer system. Do not connect roof <br /> drains directly to the lateral or side sewer. <br /> Distribution List(Route all plans/materials): <br /> ®Development Technician- SABRINA FANDLER <br /> Sewer&Drainage: <br /> ®Brian Doolan(always gets plans) <br /> ®Arnie Roshak(always gets plans, Drainage Report when Combined System) <br /> 'Dane Zimmerman(gets plans&Drainage Report when separated System) <br /> ❑Erik Emerson(gets plans&Drainage Report when Waterfront Place Central) <br /> Traffic—Michael Brick <br /> ®Water—Richard Hefti <br /> ®Water—Jim Spooner(share with Tim Markham) <br /> ®Real Property—Mike Palacios <br /> ®Building Official—Tony Lee <br /> ®Permit Services Manager—Paul McKee <br /> ®Transit and Transportation—Vincent Bruscas <br /> ®Industrial Pretreatment—Jeff Kerwin <br /> CC List(Route Distribution Sheet Only): <br /> Streets—Roy Harris /may <br /> ®Utilities—Mark Sadler / f <br /> Revised 4/5/2017 DIST1706-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.