Laserfiche WebLink
INSPECTION REPORT <br /> _ Date 07 7 Pe it: '/.97 <br /> Contractor: t).a./ bi <br /> Owner: '6/14/n{n /&/ <br /> ,54// <br /> Site Address: 92 2 i c)1 i-- ,Z'1 7 <br /> r-4 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> Aervice <br /> lab/Conduit ❑Foundation ❑Ceiling Grid <br /> Slab/Conduit Grid <br /> ough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final //�� <br /> OTHER OR CONSULTATION: ��5' 336 , 37,z if <br /> ROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> El <br /> V❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Jl , %�- - � auk <br /> gml EGA Lcz-r1 0th-, desk- <br /> .5� --( , ; I--e ,- <br /> Inspector: Date: ii075?? <br /> EIR(10/06) DATABAR,INC.. <br />