My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4201 RUCKER AVE COMMUNITY HEALTH CENTER 2019-04-10
>
Address Records
>
RUCKER AVE
>
4201
>
COMMUNITY HEALTH CENTER
>
4201 RUCKER AVE COMMUNITY HEALTH CENTER 2019-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2019 9:26:24 AM
Creation date
3/27/2018 12:05:11 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4201
Tenant Name
COMMUNITY HEALTH CENTER
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Management Questionnaire For <br /> Single Family Residential / Duplex / Small Projects <br /> [ _...7 i..2" • <br /> Step 1:Fill in the Quantities below: <br /> The total amount ofproposed hard surfaces(rooftop,pavement, etc.)for2 161 <br /> ( ft p, my project site is: S.F. (Box 1) <br /> The amount of existinghard surfaces on my project site that will be removed or replaced is: 932 S.F. (Box 2) <br /> The amount of net new hard surfaces on my site(proposed minus existing to be removed/replaced)is: 11,229 S.F. (Box 3) <br /> Step 2: Evaluate the three statements below by selecting TRUE or FALSE: <br /> 1. The value of Box 2+Box 3=Box 1, above. Reserved for City of Everett Public Works Approval Stamp <br /> ANSWER: TRUE <br /> *If False,re-evaluate your areas and try again. <br /> 2. The value in Box 1 above is 2,000 square feet or more. APPROVED <br /> ANSWER: TRUE PUBLI W RKS D PP� <br /> *If False,only complete General Information&Construction Stormwater Plan. BY <br /> 3. The value in Box 3 above is less than 5,000 square feet. DATE [ '"fig' '1913-. <br /> CITY OF EVERETT REVIEWED FOR PERMIT <br /> ANSWER: TRUE <br /> *If False,submit an Engineered Drainage Report addressing MR#1-9. <br /> Step 3: Proceed with this entire Questionnaire if all 3 answers above are TRUE. <br /> General Information: <br /> Project Site Address: 4201 Rucker Ave, Everett,WA 98203 <br /> Prepared By: Franklin Ng,Architectural Werks, Inc. <br /> Date Prepared: 7/21/17 <br /> Existing Site Information: <br /> 1. Please describe the existing structures,hard surfaces,slopes,drainage patterns,drainage <br /> pipes,vegetation,etc. <br /> The existing property is comprised of(2) lots,the main lot where a 3 story, 25,059 SF <br /> building exists along with surface parking and an accessory lot where there is additional <br /> surface parking.The site is generally paved with landscaping at the perimeters and in islands <br /> within the parking areas. Drainage for the main lot occurs mainly at(2)catch basins and also <br /> into the Alley.The drainage at the accessory lot occurs via(1)catch basin and at Hoyt Ave. <br /> Both lots generally slope from west down to the east. <br /> 2. Please provide the following quantities of existing hard surfaces in square feet: <br /> Existing Roof Area:9,981 SF <br /> Existing Other Hard Surfaces(pavement,gravel,etc.):26,881 SF <br /> 3. Which direction does the site currently slope?(Towards a street,towards an alley, <br /> towards a neighboring property,etc.)The main lot site slopes generally towards the Alleyin <br /> Pag of 8 <br /> CITY OF EVERETT 1 3200 Cedar Street 1 Everett, WA 98201 1 425-257-8810 I everettwa,gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.