Laserfiche WebLink
T. <br /> - wire*are o" c-a,ry"a:hare peese.ee o� _ <br /> reeled..:et<. .M." '";,remed NASH AND ASSOCIATES <br /> I"a..".r mit Ise ease Iron: <br /> ...amebic.axerereshoe bem solvedes i,the peke t ",y GENERAL NOTES: <br /> I6.rooN.�W <br /> ".Pa-aG;for Ver cwt two r.s soman.:ac`ep` _ - -• <br /> I.All construction per applicable codes and ordlnances. <br /> / 103/4"• / 2012 IRO,1130.-2012 WASHINGTON STATE ENERGY CODE <br /> ROOFING MATERIAL • <br /> FINISH PER ELEVATION • 2.Verify all dimensions on Job site.Bring discrepancies <br /> ON 1,16"OBS SOLID CDX 24-0 PLYWOOD. to the attention of Owner and/or Designer. • <br /> SHEATHINGS CI 0 6°OL.EDGE • 1� 3.Owner 0111 verify window 51205 and nra faGtu'er(5)With <br /> 8d O 12'oD.FIELD L framer before Start of construction. <br /> • !7/76'OSB ACX PLYWD®EVES) 3/4 <br /> 24"CARDBOARD BAFFLE MIN.In LNDERLAYMENF <br /> ALLOW FOR I"AIR SPACE NAIL 6°EDGE,1FIELD - <br /> MIN.EXTEND 12"ABOVE WITH ed NAILS,U.N.O.UHANDRAIL: t'E <br /> INSULATION. m 4.One window per bedroom shall meet egress co e- <br /> PM2IPIN"-2'6 <br /> . PRO..EGTION FROM 5.Skylight glazing per 2012 IBC. <br /> WM11M1b LESS- \ NOSING6,Truss marefacturer shall supply shop drawings to Owner <br /> • <br /> SOLID-'_ATHING Z • and Framer to review and approve before Fabrication. 25 I <br /> IS 'i,' <br /> OR ci2X PLYWD. .% 1.Owner will erify electri al and hent layouts with , CHITEC <br /> ' WHERE EXPOSED .Installer before Installation. , <br /> TO I'EATFER N <br /> '`t'VAVA%%tA,,',T }— \ '�' 8.Under all parallel bearing walls use double Joists or as <br /> ., I, noted on plan. Double Joist(or extra TUI)under.all non- / <br /> IOPEN RAIL, �` bearing parallel walls. r. <br /> 1 Gi•Y MAS NASH <br /> �''�I�i�r r r r r r i r r PICKETS SPAGE T5 SHALL BEEN '/ 9.121 roducts to be Irbtalled manufactuer's STA'- WASHINGTON 7 <br /> TOP PL. !►y,��������A��, P Per <br /> IX FASCIA BD. LESS THAN 4'CLEAR ♦ \ _ Installation guide and apprpved reports. <br /> W/METAL <br /> APPROVED TRIYJ.,L i BEARING i .i HANGER IO.AII metal connections to treated wood shall be at a <br /> MANIFAG'NRERS SEAL. �' minimum;triple zinc ZMAX(6185 per ASTM A653),Hot Dip •�t - m / / Galvanze(ASTM A123 for connectors and ASTMI53 For <br /> == SEEROOFPLAN - J�" / fasteners and anchors. <br /> •'1►� INSULATE PER MEC - m Y/' II.All bathroom fans,kitchen hood,and dryer duds shall be n <br /> 2X BIRD BLK'6.W/ 'OR / exhausted though the attic to the roof or through the <br /> 2"SCREENED VENT �-A Y _ / floor system to an outside wall. All wall ducts shall WW LyiAy <br /> HOLES WITH 1/4i %pp"X 10"ANCHOR BOLT W/3°X3"X / / 0 } opening. L . <br /> ��+ /q"PLATE WASHERS®48"oa.NO terminate at least 36"from a window o In C�_�• �..) <br /> META • <br /> L ION RESISTANT LESS THAN 4)"d NO MORE THAN 12' 204 STOP sir— •-. 3-2x12 <br /> METAL MESH COVERING L IYI NG AREA o <br /> FROM EA.END SILL CORNER,JOINT, STRINGERS rg. U <br /> IR END,OPENING ETC,, 1°MIN. <br /> FIRE BLOCK ALL VERTICAL EMBEDMENT INTO GONG.EXCEPT a 2-2X HEADER W CLIMATIC AND GEOGRAPHIC V W . B <br /> OPENINGS IN wALLs AT SHEAR WALLS-SEE SHEAR WALL - • - S DESIGN CRITERIA: O <br /> PLATES AND FLOORS NAILING SCHEDULE. +III 0 F"' <br /> • 2x P.T.SILL FLOOR JOIST �� 2X4 BLOCKING Z H <br /> (FIRE-STOP) TERMITE: SLIGHT TO MODERATE <br /> .'_ I- _ DECAY: SLIGHT TO MODERATE �y <br /> . \ 5' WINTER DESIGN TEMP: 11' °� U •E <br /> E #4 REBAR a Ib"O.C.HORIZONTAL FIREBLOGKS '9 . ICESHIELD REOUIRED: NO �JJ <br /> ENGINEERED JOIST6,SIZE AND ^ FIREBLOCK STAIRS: <br /> N. f°O.1 <br /> • <br /> SPACING PER PLAN OR 2X JOISTS ONCE IN TOP 6 BOTTOM FLOOD HAZARDS .2003 1412 FIRM CI� <br /> FIN.FLR. OF RUN BETWEEN STRINGERS \ AIR FREEZING INDEX. 250 „/77�"-1111 TY: <br /> #4 REBAR a 48"OL.VERTICAL d ALONG RUN BETWEEN SMOG <br /> H 17 fl I USABLE SPACE UNDER STAIRS \ MEAN ANNUAL TEMP: 50 Y <br /> III I�I TO°T I EHR'FIRE C3.(TWO.LAE .. " w <br /> 3"MIN. 5/8'TYPE'X'G.W.B.(TWD LAYERS <br /> AT STAIR CEILING) - <br /> • <br /> TOP PL '� u u u � �cLR. P. Ni., • \ DESIGN DATA: <br /> rmr• — W14 r <br /> _ #4 REBAR � _ <br /> W"J'BAR ROOF LOADS: LL 25#/SF(SNOl^) <br /> (2)2x TOP PLATE,LAP CORNERS, DL 15#/5F <br /> OFFSET END JOINTS BY 48' �— - . TOTAL 40K/5F <br /> a �i - ALL FOOTINGS TO BEAR ON STAIR NOTES: <br /> ln <br /> e �1; - 'BEARING SOIL FLOOR LOADS: LL 40#/SF <br /> ..� ss"GYPSUM WALLBOARD,TTP. ^ /� may/ /� RISER HEIGHT = 1-3/4"MAX. • <br /> Tie"065.OR PLYWD.SHEATHING. `+� W/PVA VAPOR BARRIER a WALLS ©STAIR DETAIL I 1 P I GAL TREAD DEPTH= 10°MIN. - DL IO//5F -� <br /> NAIL 6"EDGE,12'FIELD WITH 8d ^•� AND CEILINGS — <br /> — TOTAL 50#/SF • <br /> NAILS UNLESS NOTED OTHERWISE '���� NEIFSCALE:N.TS. <br /> ©STD" FOUNDATION DETAIL DECK LOADS: LL 60#/n//S id- <br /> / ®SCALE:N.T.S. PER I%0,405.1.9 t 0408.13.1 . TOTAL 10#/SF Q <br /> 2x STUDS a 16"o.G.TTP. L V I NG AREA - _ SOIL. I50O P5F MINIMUM <br /> I FIRE BLOCK ALL VERTICAL _.1 <br /> OPENINGS IN WALLS AT CONCRETE: 2500 PSI AFTER 23 DAYS <br /> PLATES AND FLOORS (5/ SACK MIX) . <br /> ' -3000 PSI FOR EXTERIOR FOUNDATION <br /> WALLS,PORCHES,STEPS,AND OR <br /> -GARAGE SLABS-AIR ENTRAINMENT <br /> IS BETWEEN 5-1%(TABLE 4022 1RC) <br /> "X lo"ANCHOR BOLT W/3203°0 k" U <br /> SIDING,SEE PLAN FOR ITPt \ PLATE WASHERS SILLa B.00.NO LESST, .MASONRY: PER 2012 IBC <br /> \V THAN E 6 NO MORE THAN I2' <br /> FN; PE.END 1°CORNER,JOINT, GARAGE <br /> it <br /> END;OPENING ETC. 1°MIN. STEEL: PER 2012 IBC(GRADE 40) <br /> EMBEDMENT INTO GONG.EXCEPT a - WOOD: PER 2012 IBC <br /> SHEAR WALLS-SEE SHEAR WALL <br /> NAILING SCHEDULE. NAILING:. PER 2012 IRC NAILING PER TABLE <br /> ' TOP FLANGE JOINT 1 <br /> 0602.3(1),8802.10 <br /> 2x BOTTOM PLATE HANGER PER PLAN-- WIND, 85 MPH <br /> Y4'TOG PLYWOOD SUB-FLOOR - SEISMIC, SEE CALCULATION PACKET <br /> • 2x P.T.SILL (GLUED f NAILED)NAIL 6"EDGE, INSULATE PER YSEG., <br /> 12"FIELD W/IOU NAILS. SOLID BLOCKING E • .WEATHERING POTENTIAL MODERATE date: 01/0140 <br /> FIN.FLR. / ERG.WALL ABOVE TYP. permit: <br /> -2 .J -- ' ' ---- —__ — wr _ FROST LINE: 12" revisions, <br /> 4°e DS.TI6Hri1NE,POSITIVE �4"GRANULAR BED E.FP.: 45 P5F <br /> DRAIN To STORM SYSTEM r d • ,,,,,�,',,,,�,��',/ °elf 4°GONG SLAB ON 4"BEAM: DOUGLAS FIR 85 u2 <br /> FIN.GRADE TO SLOPE—`Y \ --.. a. �i�� �e�� ° 6"BEAM: <br /> ;r: 111111111110111111111111111611 fb=1315 P51 <br /> AWAY FROM BUILDING <br /> Z ,�v�\/�� II - \ o _��t�lw'e1 Ir.�c:..�r:rl 121 .11,..,_.3 rife%tom.icii E=1,600AOU <br /> / \/ - 10 1 ENGINEERED JOISTS,SIZE AND o 4"POST: DOUGLAS FIR#2\ \" SPACING PER PLAN. 5"POST: fb=815 P51 <br /> \ 48"MAX. GRAIALSPAGE <br /> N \�/° . UNBALANCED E=1300000 <br /> :\ Nv; - - (TALLER WALLS PER PLAN) - - SEE FOUNDATION PLAN I - JOISTS 4 RAFTERS HEM FIR#2 <br /> ����� FOR BEAM SIZE E 6 STUDS: Fv=15 <br /> /,/ ° POST SIZE/SPACING 2x4 GUSSET EA.SIDE. - fb=550 F51 drawn by Ro <br /> Z \�\\�\ REBAR PLACEMENT E=1,300,000 cheeks �LaJ: <br /> \�/ - SEE DETAIL 02 ABOVE 10#FELT "SIMPSON"HGAMIO . <br /> . POST TO GONG. GLU-LAM BEAMS: SHEET <br /> •° 4° Iv=165 psi • <br /> 2 , __ .�6 MIL.POLY VAPOR BARRIER J a ,'4_ ° IMIfb=2,400 p51(reduced by size G <br /> factor,CP"KU <br /> __ —' E=1soo,Uoo psi <br /> m ALL REINFORCEMENT NOTE: <br /> 4"a PERF.FOOTING DRAIN TILE 0) MUST BE TIED IN PLACE VARIATIONS FROM THE ABOVE . <br /> IN/CLOTH COVER 0 GPANLLAR FOR FOUNDATION INSPECITON - <br /> COVER AS RENBY SOIL _ WILL BE <br /> D. <br /> CONDITIONS SEE FOUNDATION PLAN SEE FOUNDATION PLAN NOTED ON THE PLANS. <br /> FOR FTG./FON.SIZE FOR PAD SIZE 1.SUBFLOOR: <br /> ALL FOOTINGS TO BEAR ON ALL FOOTINGS TO BEAR ON TNG PLYWOOD OR 055 APA RATED <br /> BEARING SOIL BEARING SOIL - STURD-I-FLOOR IS"0.C.,5/4" <br /> - WALL 0 ROOF SHEATHING: <br /> APA RATED SHEATING 24/16 1/16" <br /> FOOTING FOR: <br /> n • 0 TYPIGAL WALL SECTIONS WALL-18"x 12"FOOTING <br /> IS"BELOW GRADE <br /> ♦ • SCALE:NTS. <br /> #4 STUB STEEL-48"o.C.VERT.• <br /> UNLESS NOTED OTHERWISE <br />