My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3716 UPLAND AVE 2018-03-27
>
Address Records
>
UPLAND AVE
>
3716
>
3716 UPLAND AVE 2018-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 2:46:38 PM
Creation date
3/27/2018 2:46:19 PM
Metadata
Fields
Template:
Address Document
Street Name
UPLAND AVE
Street Number
3716
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S- EAVV"AL_` SCHEDULE (CDX) <br /> AA <br /> + 0 SILL PLATE & BOTTOM TOP PLATE Iil <br /> I II MARK SHEATHING EDGE NAILING FIELD NAILING CONN. @ FND CONN. <br /> 3/a" CDX ONE 5/a" 0 A.B. @ 48" LTP4 @ 20" 0/C °! N EF <br /> CH– FACE 8d @ 6" 0/C 8d @ 12" 0/C 0/C W/ 2x SILL W/ 2x BOTTOM <br /> I PLATE PLATE <br /> '/a" CDX ONE8d @ 4" 0/C 8d @ 12" 0/C 0/C W/ 2 SILL' LW/ 2x C BOTTOM Cl) <br /> FACE PLATE PLATE � co <br /> B C---) <br /> SHEARWALL NOTES v i <br /> N <br /> 1. ALL STUDS, BLOCKING, TOP AND BOTTOM PLATES SHALL BE HEM–FIR NO. 2 UNLESS 0 iri <br /> NOTED OTHERWISE ON PLANS. ALL SHEATHING EDGES MUST BE BACKED WITH 2x OR WIDER U) > <br /> FRAMING (SEE NOTE #3). Q a r <br /> CC 1 < o <br /> _ 2. SHEATHING MAY BE INSTALLED EITHER HORIZONTALLY OR VERTICALLY. ALL SHEARWALL H–1_ '- "• <br /> G – SHEATHINGANDTOTHE MUSTINSIDE EXTENDEDGE TOOF THE <br /> FRAMING OUTISDEAROUEDGEND OFOPENINGS.ALL HOLDOWN POSTS AND CORNERS, 5) ww rn <br /> HEP (L) .5) <br /> U) Y r r 2 <br /> T 3. WHERE SHEATHING NAILING IS SHEARWALL #3 AND GREATER, ALL FRAMING MEMBERS I o °N' <br /> RECEIVING EDGE NAILING FROM ABUTTING PANELS SHALL NOT BE LESS THAN A SINGLE .O 3 <br /> ... .t :..--' -...1..---- -- t:-.- -.. -:, 1,--:,--..7.. .- --. ..--st <br /> • 3 <br /> 3–INCH NOMINAL MEMBER. ADDITIONALLY, WHERE SHEARWALLS ARE SHEATHED ON BOTH p ° °7FACES, ALL STUDS AND PLATES RECEIVING EDGE NAILING FROM BOTH FACES MUST BE A wSINGLE 3–INCH NOMINAL MEMBER OR PANEL JOINTS MUST BE STAGGERED. IN EACH OF NTHESE CASES 3x STUDS ARE REQUIRED UNLESS SPECIFICALLY NOTED OTHERWISE ON THE `�PLANS BY THE ENGINEER. FOR SHEARWALLS #3 AND #4, A 2x SILL PLATE MAY BE USED J <br /> 4 IF TWO TIMES THE NUMBER OF ANCHOR BOLTS REQUIRED BY THE SHEARWALL SCHEDULE 0 z <br /> ARE USED AND ARE EVENLY SPACED (SEE 2003 IBC SECTION 2305.3.10). z_ <br /> --i---, a <br /> DA DOUBLE TOP PLATE W/ EDGE NAILING ©HOLDOWN PER SCHEDULE AND 4. SHEARWALL NAILING CRITERIA IS BASED ON TABLE 2306.4.1 OF THE INTERNATIONAL Cl) <br /> (STAGGER) PLAN (HDQ8–SDS3 SHOWN) BUILDING CODE (FOR CDX) OR REPORT NER-124 (FOR OSB). VALUES ARE BASED ON <br /> B SHEARWALL EDGE NAILING AT ALL PANEL HEM–FIR NO. 2 FRAMING WITH COMMON NAILS. <br /> HO COORDINATE ALL STUD AND <br /> EDGES. BLOCKING AT ALL PANEL EDGES PLATE SIZES w/ SHEARWALL 5. HOLDOWNS AND OTHER CONNECTIONS MAY BE REQUIRED AT THE ENDS OF MANY <br /> WHERE APPLICABLE. SCHEDULE REQUIREMENTS <br /> ©EDGE NAILING TO HOLDOWN POST (FULL SHEARWALLS. SIZES AND LOCATIONS OF THESE CONNECTORS ARE INDICATED ON THE <br /> HEIGHT) STAGGER INTO DOUBLE STUDS ©EDGE NAILING TO POSTS, TRIM PLANS. REFER TO THE APPROPRIATE DETAILS AND/OR HOLDOWN SCHEDULE FOR LJ IM <br /> D©STUDS @ 16" ON CENTER STUDS, AND KING STUDS ADDITIONAL INFORMATION REGARDING ANCHOR BOLTS, EMBEDMENT LENGTH, ETC. WHERE (2) 0 I] O <br /> DE PRESSURE TREATED SILL PLATE WITH K©BEARING STUD FOR HEADER 2x's ARE USED AS A HOLDOWN POST, SHEARWALL EDGE NAILING MUST BE STAGGERED INTO <br /> EDGE NAILING AND ANCHOR BOLTS PER EACH MEMBER OF THE POST. W Q 00 <br /> SHEARWALL SCHEDULE. 0 RIMJOIST TOMIN 6. ANCHOR BOLTS MUST BE EMBEDDED A MINIMUM OF 7" INTO CONCRETE OR GROUTED — fl <br /> STOP PLATE SPLICE NAILING TO BE (8) 16d THICKNESS ATT ALLLL <br /> SINKERS (MIN). LAP 48" MINIMUM. CENTER SHEARWALLS CMU, AND SHALL BE PLACED TO PROVIDE A MINIMUM OF 2" COVER. PROVIDE 3" COVER (f) / Q <br /> SPLICE ON STUD. FOR CONCRETE CAST AGAINST SOIL. LL) Q <br /> 1Y <br /> STD. S- EAWALL ELEVATION W/ SIM 7. ALL MACHINE BOLTS SHALL BE ASTM A307 OR BETTER. HILTI KWIK BOLTS/SIMPSON <br /> TITEN HD BOLTS OF THE SAME DIAMETER AS SHOWN IN THE SHEARWALL SCHEDULE MAY BE V 0 <br /> SCALE: Y2"---1'-0" SUBSTITUTED FOR ANCHOR BOLTS INTO EXISTING CONCRETE. BOLTS SHALL BE EMBEDDED A W <br /> MINIMUM OF 5" INTO EXISTING CONCRETE. m Li <br /> CO <br /> ry <br /> 8. ALL NAILS AND CONNECTORS IN CONTACT WITH PRESSURE TREATED WOOD (EXCEPT FOR Q <br /> BORITE TREATED WOOD) MUST BE HOT DIPPED GALVANIZED OR STAINLESS STEEL TO RESIST W <br /> CORROSION. LL; IM > <br /> • <br /> o L,J <br /> 9. WHERE 10d NAILS ARE SPACED AT 3" ON CENTER OR LESS, NAILS MUST BE STAGGERED. <br /> HOLDOWN POST. SEE FOR DOUBLE SIDED <br /> HOLDOWN SCHEDULE OR LENGTH OF 10. OSB OF EQUAL OR GREATER THICKNESS MAY BE SUBSTITUTED FOR CDX SPECIFIED IN <br /> PLAN FOR MINIMUM , SHEARWALL SHEARWALLS, THE SHEATHING - <br /> SHEARWALL SCHEDULE: <br /> ON EACH FACE MUST EXTEND <br /> REQUIREMENTS CONTINUOUS BETWEEN <br /> p� HOLDOWN POSTS AS SHOWN. <br /> ii rN <br /> IIIIIIK <br /> OPENING PER PLAN. .......© <br /> LOCATION OF <br /> HOLDOWN TO BE STHDI4RJ <br /> INSTALLED <br /> • N–TYPE OF HOLDOWN TO BE Drawn By: CCC <br /> INSTALLED Checked By: CCC <br /> SHEARWALL DESIGNATION – SEE Date: 11-26-14 <br /> SHEARWALL SCHEDULE FOR FRAMING, <br /> NAILING AND ANCHORAGE SDA JOB NO. <br /> LATERAL VAKING LEGEND REQUIREMENTS 7L-21 <br /> STRUCTURAL 7- <br /> DETAILS s 3. o (/.11---/if <br />
The URL can be used to link to this page
Your browser does not support the video tag.