My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3716 UPLAND AVE 2018-03-27
>
Address Records
>
UPLAND AVE
>
3716
>
3716 UPLAND AVE 2018-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 2:46:38 PM
Creation date
3/27/2018 2:46:19 PM
Metadata
Fields
Template:
Address Document
Street Name
UPLAND AVE
Street Number
3716
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. SILL PLATE AND ANCHOR BOLTS PER \1 <br /> SHEARWALL SCHEDULE. MIN 5/a" 0 P I- <br /> WALL PER PLAN (2) LAYERS OF 90# _ _ „/ ANCHOR BOLTS @ 48" 0/C L <br /> SILL PLATE AND ANCHOR BOLTS FELT OR EQUIVALENT — n`1 N E E <br /> PER SHEARWALL SCHEDULE. (USE SLAB PER PLAN <br /> 2x6 P.T. SILL PLATE W/ %" 0 I 1_11 I I \\\\ <br /> • J—BOLTS @ 48" 0/C MIN.) III i — I (2)H—BARS AT TOP <br /> • BACKFILL W/ POROUS —I 11.__H U) <br /> MATERIAL (TYP) I— <br /> �_� +� <br /> 6" o <br /> - �_. _ _ <br /> in <br /> f -1 11 I- 1-1 I1=1 11=1I 1 U <br /> -III VIII I I II III-III z" CL. • O Ifi <br /> N <br /> FROST DEPTH 8" WALL w/ #4 BARS 18" o/c > <br /> (18" MIN) EACH WAY. (2) #4 BARS @ TOP. Q Q r0 E <br /> HOOK VERTICAL BARS INTO FOOTING V—BARSRETAINING WALL NOTES I Q o <br /> 8 — ALTERNATE HOOK DIRECTION. �• 2009 INTERNATIONAL BUILDING CODEC J O� ` 6 <br /> + 'g. 35 PCF EQUIV. FLUID PRESSUREC>> <br /> NO SURCHARGE '—Cf) Y Q <br /> (2) #4 BARS f'C = 2500 PSI Q) 0 01 N <br /> 4" 0 PERFORATED PLASTIC PIPE. 16 CONTINUOUS Fy = 40 KSI (#4 AND SMALLER) 0 o <br /> CENTER IN ONE CUBIC FOOT OF H—BARS n <br /> FREE DRAINING GRAVEL AND DRAIN Fy = 60 KSI (#5 AND LARGER) N N a> <br /> TO APPROVED OUTFALL. SOIL BEARING = 1500 PSF — 0 Q rn <br /> FNDN/SHEAWALL CONN H BACKFILL W/ POROUS MATERIAL NWN <br /> O SCALE: 3/4"=1'-0° <br /> 0 '71CLIZ <br /> D O <br /> MATCHING DOWEL I <br /> EACH VERT. LAP 42 (n <br /> BAR DIAMETERS MIN <br /> 4" 0 PERF. PLASTIC PIPE V BARS <br /> • <br /> CENTERED IN 1 CUBIC FOOTjr \ <br /> WASHED PEA GRAVEL AND 1 <br /> • SEE FOUNDATION DRAINED TO DAYLIGHT OR Iv I I Q <br /> e• a a SCHEDULE FOR APPROVED OUTFALL / -_,I N <br /> REINFORCEMENT III Q 00 <br /> REQUIREMENTS <br /> ono <br /> • as <br /> • o°o °ao o • I 1 I <br /> b° a�Oo <br /> ry Q <br /> a T-BARS oeoo <br /> o <br /> . °:°08.3:°<8. <br /> BACKFILL SOIL NO STEEPER ~ <br /> 4' MAX Via. THAN 45 DEGREES. SEE III - <br /> D FOUNDATION NOTES FOR m W <br /> • D BACKFILL REQUIREMENTS. LD <br /> Q __ (Y <br /> ryI--,, Li> <br /> 2H MIN. 0— 3" CL I — W <br /> ®STEP DOWN FOOTING DETAIL III- <br /> 11=111— <br /> A 8 <br /> CA\TIEEVER RETAI \ \ C WALL SC - -3ULE: \O SURC -ARC <br /> Drawn By: CCC <br /> Checked By: CCC <br /> H A B C D V-BARS H-BARS T-BARS Date: 11-26-14 <br /> •1 _ 2'-4' 19" 8" 0" 10" #4@18"o/c #4@10"o/c #4@12"o/c SDA JOB NO. <br /> 7L21 <br /> 4'-6' 46" 8" 0" 10" #4©16"o/c #4@10"o/c #4©12"o/c <br /> STRUCTURAL , <br /> I z <br /> DETAILS <br /> S- 6 . 0 tI - 7 '� <br />
The URL can be used to link to this page
Your browser does not support the video tag.