Laserfiche WebLink
PUBLIC WORKS PERMIT Date: 12/1/2016 <br /> Public Works Permit#: PW1612-006 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Parent Permit#: C1606-065 <br /> Everett, WA 98201 Planning Reference#: SUB14-003 <br /> (425)257-8810 <br /> Public Works Fee$: $ 65.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> ALPINE HEIGHTS DEVELOPMENT STEVE SNYDER <br /> 120 SW EVERETT MALL WAY ST100 120 SW EVERETT MALL WAY <br /> EVERETT WA 98204 EVERETT WA 98204 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# SITE ADDRESS: 7910 20TH AVE SE <br /> CONSTRUCT NEW TOWNHOUSE UNIT/SITE WORK <br /> THIS PERMIT INCLUDES SEWER, WATER, DRAINAGE AND DRIVEWAY WORK <br /> LOT 80 OF ALPINE HEIGHTS SUB14-003 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Site work to be done per plan approved on 12/01/2016. <br /> 5. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 6. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 ["'I <br /> prior to starting construction and with other inspection requests. <br /> 7. A sprinkler system is required for this building in compliance with the requirements of <br /> NFPA Standards 13D. <br /> 8. Install erosion control measures as determined by the Public Works Inspector, such 0 <br /> as silt fence, straw bales, swales, or erosion blankets. t1 <br /> 9. Connect side sewer per City Standard#'s 601 through 604. <br /> 10. Connect rooftop downspouts to the drainage system provided for this lot. 'Z <br /> 11.All excavated material from foundation, sidewalk, and driveways shall be hauled to <br /> approved, permitted site. No wasting of material is allowed on this building lot. ,. <br /> 12. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to <br /> be kept clean and open for pedestrian travel. <br /> 13. Driveway to Garage shall be paved. JUN 12 201? 0 <br /> Public Works Fee Breakdown: CITY OF EVERETT a <br /> Plan Review$20.007 iv Services <br /> (WI- <br /> Inspection Inspection $20.00 TO pnc,vilmt3 <br /> Driveway$25.00 ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> ry f z, causes of action that may arise because of installation and maintenance of the <br /> Appoved for C nstruction Date improvement or other right-of-way use hereto applied for and further agrees to <br /> remove same upo notice from the City and to replace public property <br /> Ja- 17 <br /> dama•-d ereby. <br /> l � ��'` <br /> FINAL INSPECT N\ Date C —/ <br /> Approved as Constructed Si. tur- of • ant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />