Laserfiche WebLink
INSPECTION REPORT <br /> / >."::: <br /> 7- Date. J hi Permit: Gk.QCAD-ouG <br /> Contractor: <br /> Owner: \\NR. <br /> Site Address: 1 D -v{._ SC- <br /> TYPE <br /> 6TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Naili g ❑Plumbing Final <br /> ❑Electrical Final Shear Naili g GAS PIPE <br /> SITE WORK Roof Nailin Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> X),PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION El <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: ] Date: 4-s--) 7 <br /> EIR(10/06) DATABAR,INC. <br />