My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 25TH AVE SE 2018-03-28
>
Address Records
>
25TH AVE SE
>
10200
>
10200 25TH AVE SE 2018-03-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 9:14:24 AM
Creation date
3/28/2018 9:14:21 AM
Metadata
Fields
Template:
Address Document
Street Name
25TH AVE SE
Street Number
10200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, ENGINEERING <br /> PUBLIC SERVICES DEPARTMENT <br /> July 14, 2017 <br /> Jeff Hoover, PE <br /> Hargis Engineers <br /> 1201 Third Avenue Suite 600 <br /> Seattle, WA 98101 <br /> RE: Owner: Everett Public Schools <br /> Job Address: 10200 25th Ave. S.E. <br /> Plan Check Number: E1706-123 <br /> Dear Mr. Vital, <br /> In response to your application for a construction permit, your plans have been examined and you <br /> are advised that the issuance of a permit is being withheld for the reasons listed below. These <br /> comments address electrical issues only. Additional revisions or additions may be required by <br /> other departments (such as Utilities, Planning or Fire). All references refer to the (2017 National <br /> Electrical Code,) (2017 Chapter 296-46B WAC rules,) as amended by the State of Washington <br /> and/or Washington State Energy Code 2015 Edition, and adopted by the City of Everett, unless <br /> stated otherwise. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two new complete sets of drawings reflecting the <br /> corrections requested. <br /> 1. The load calculations on page E-400 start in the MDU panel at 208 volts and changes at the <br /> portables to 240 volts. I believe the entire system is at 208 volts and should be calculated <br /> at 208 volts all the way through or the transformer is to be shown on plans that changes <br /> the voltage to 240 volts. <br /> If you have any questions, please email or call me at (425) 259-7270. Upon submittal of the <br /> drawings, your application will be given priority and plan reviews will recommence. All required <br /> submittals shall be sufficient detail and contain sufficient information to ensure that the proposed <br /> struct. --will be constructed in compliance with all adopted codes. <br /> Please prepare a response letter showing where each item in this correction <br /> letter is addressed on the plan set. <br /> Sincerely, <br /> Page 1 of 2 <br /> CITY OF EVERE1T • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax(425) 257-885-7-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.