Laserfiche WebLink
Steve Banks <br /> From: Brendon Inman <Brendon.Inman@hargis.biz> <br /> Sent: Thursday,August 17, 2017 6:04 PM <br /> To: 'Collins,Jennifer A.'; Steve Lee; Cindy Bergsma <br /> Cc: Jeff Hoover;travis@steeleec.com <br /> Subject: RE: 2nd Request Correction Letter <br /> Attachments: Eisenhower MS - Panel Port 6 - Corrected Voltage Reference.pdf <br /> Cindy: <br /> As indicated in the correction letter,we will provide (2) updated sets of drawings showing this, but for your use and <br /> reference in the meantime—please see attached for the corrected panel schedule for"Port 5"showing the adjusted <br /> reference voltage. All other information on the drawings is accurate, including the load/calculations for upstream <br /> distribution panel 'MDS'. <br /> Thanks, <br /> Brendon Inman, PE,LEED®AP BD+C <br /> Principal, Electrical <br /> d I 206.436.0457 o I 206.448.3376 c I 206.459.9892 v I card e I brendon.inman(a)hargis.biz <br /> HARGIS <br /> mechanical•electrical •telecommunications•security•energy services <br /> From:Cindy Bergsma [mailto:CBergsma@everettwa.gov] <br /> Sent:Thursday,August 17, 2017 3:38 PM <br /> To:Collins,Jennifer A.<JCollins@everettsd.org> <br /> Cc:Steve Banks<SBanks@everettwa.gov> <br /> Subject: 2nd Request Correction Letter <br /> Importance: High <br /> Hello Jeff, <br /> We are concerned this was missed, and with school starting up in September don't want this to get forgotten. <br /> Please see the attached correction letter and respond as soon as possible. <br /> Let me know if you have any questions. <br /> Thank you, <br /> Cindy Bergsma <br /> City of Everett Public Works Department I Permit Technician <br /> 3200 Cedar Street, Everett, WA 98201 <br /> Office: 425-257-8810 <br /> Direct: 425-257-8921 <br /> Email: CBergsmageverettwa.gov <br /> i1 <br />