Laserfiche WebLink
INSPECTION REPORT <br /> %': Date 9/45//7 Permit: 6/70 -Z/3 <br /> 74, <br /> Contractor: OanZer Ft-eP jG <br /> Owner: Peed"? <br /> Jdl? <br /> Site Address: IP/0S 31st e cf t 2.(05 <br /> TYPE OF INSPECTION REQUESTED <br /> FC.T.2 ? BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ough In ❑Structural Slab ❑OK to insulate <br /> IDOK to insulate <br /> ice ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED El <br /> ▪ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> IP <br /> .r - 0 A__k <br /> E) <br /> /C_____ <br /> ti--3 <br /> .....------ <br /> IN,—, `a <br /> S'' S' WIPP <br /> •6,7) a-, .t .e__ Ac-- <br /> .4( ,,,,,, 40 i <br /> Inspector: 4011111. Date: <br /> EIR(10/06) DATABAR,INC. <br />