Laserfiche WebLink
INSPECTION REPORT <br /> /.‘ idm;',4 Date g/2Z,9Permit: C/7b,S/jog <br /> Contractor: <br /> Owner: ,4'1i <br /> pl? <br /> Site Address: 64,90-?_ 3/ff- je J 5 La f `Z&Go <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear NailingGAS PIPE <br /> SITE WORK ❑Roof Nailing .) ough In/Service ) Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas�-7& Sg Pipe Final ill HWT Final <br /> 4i-2--S OR CONSULTATION: ' ` / • -7-7 <br /> ; APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ K FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION El <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: q_z---117 <br /> EIR(10/06) DATABAR,INC. <br />