i-1141 ,1 <br /> 1)l sfi frok S i6- gq <br /> CEO ODE SIGN_ <br /> FIELD REPORT,,, <br /> Project Name: Everett River Front-Simpson Report: 044 <br /> GeoDesign#: 1 Polygon-127-03 Date: 05/25/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW 1505-005 <br /> 6Lo <br /> 4.VeMita, - 4„ .tomvicrokaisimarceimmtmanoiimmetrimminmikftaim twaimoutetoitivaivarsimeomumanii <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Clear,70's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure:rture:: 1115/1215 <br /> Distribution: Doug Ross(Polygon) Kirk Keck(City of Everett) _ . _ _. ___......,.,�.� <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg <br /> Attachments: m Site Plan(s) m Density Test Summary Signature: <br /> Installation Records ®Other Reviewed By: j?c4 <br /> PURPOSE of VISIT:GeoDesign representative, Ben Weinberg,was on-site part time at the request of Craig with DDS to <br /> observe the foundation subgrade for Lots 259 and 260. <br /> SUMMARY of OBSERVATIONS: <br /> LOTO <br /> Today, GeoDesign noted that DDS had excavated the foundation and crawl-space area for Lot 259. GeoDesign noted that <br /> the east side of the lot area had been over-excavated approximately 1 foot. The exposed foundation subgrade material <br /> generally consisted of a gray-brown silty SAND(f-m)with gravel (f-c) which could be probed less than 2 inches using a 1/2 <br /> inch diameter soil probe. <br /> Relative compaction of the exposed foundation subgrade material was tested using a Troxler 3430 Moisture-Density gauge. <br /> In-place density tests indicated that the exposed foundation subgrade for Lot 259 had been compacted to greater than 95% <br /> of its maximum dry density. GeoDesign notified Craig with DDS that the lot area was suitable for placement of structural <br /> backfill to bring the lot area to plan bottom of footing. <br /> LOT 260: <br /> Today, GeoDesign noted that DDS had excavated the foundation and crawl-space area for Lot 260. GeoDesign noted that <br /> the east side of the lot area had been over-excavated approximately 1 foot.The exposed foundation subgrade material for <br /> the east 3/4's of the lot area generally consisted of a gray-brown silty SAND (f-m)with gravel (f-c)which could be probed <br /> less than 2 inches using a 1/2 inch diameter soil probe. For the west 1/4 of the lot area,the foundation subgrade material <br /> consisted of a gray silty SAND which could be probed 6 inches to 1 foot using a 1/2 inch diameter soil probe; GeoDesign <br /> clearly marked the area with orange spray paint and notified Craig with DDS that we recommended removal of the loose <br /> material down to firm and unyielding underlying soil. <br /> Relative compaction of the exposed foundation subgrade material for the east 3/4's of the lot area was tested using a <br /> Troxler 3430 Moisture-Density gauge. In-place density tests indicated that the exposed foundation subgrade for Lot 260 had <br /> been compacted to greater than 95%of its maximum dry density. GeoDesign notified Craig with DDS that the east 3/4's of <br /> the lot area was suitable for placement of structural backfill to bring the lot area to plan bottom of footing. <br /> A summary of our observations and density tests can be found in the attached Figure 1, Nuclear Density Gauge Data, and <br /> Photo Log. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not Include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations, The report can only be considered <br /> final upon review of the GeoDesign project manager,as Indicated by initials In the"Reviewed Ry'section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />