Laserfiche WebLink
INSPECTION REPORT <br /> /oN,"aw..4. <br /> 4*.dimoni <br /> ,>: k.ell <br /> Date Permit: OA E —023 <br /> Contractor: �__- <br /> • <br /> Owner: <br /> 1)C5 (amu v <br /> ��<Z 3 � 5 <br /> Site Address: L( „6.,-„,e__ Se- � <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PL e <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains " g Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P, 'MIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED . , <br /> ❑ OK FOR C.O. El VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> YES; <br /> ((f <br /> Inspector: Date: 1;;Z Fl. ),''' 4 <br /> 7 <br /> EIR(10/06) <br /> �ATABAR INC. <br />